说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 煤气设备安装
1)  gas fitting
煤气设备安装
2)  installation of electrical equipment
电气设备安装
3)  install a heating apparatus
安装暖气设备
4)  coaling facilities
装煤设备
5)  equipment installation
设备安装
1.
Quality and construction period control for equipment installation of construction projects——Construction organization planning of high-speed wire equipment installation;
建设工程设备安装的质量和工期控制——高线工程设备安装施工组织设计的体会
2.
Survey control over linkage equipment installation engineering;
联动设备安装工程的测量控制
3.
Discussion on the equipment installation level control construction technology
设备安装标高控制施工技术讨论
6)  equipment installment
设备安装
1.
Combined with practical and management experience of Huangshi Ci Lake interception project(I), the equipment installment quality has been emphasized in the construction of sewage treatment projects.
结合黄石市磁湖污水截流一期工程实践和管理经验,强调设备安装质量在污水处理工程建设中的重要性。
补充资料:煤气发生站设备安装


煤气发生站设备安装
equipment erection of gas generating station

  me一q .foshengzhon shebel anzhuang煤气发生站设备安装(equipment。reetion ofgas generating station)煤气发生站的设备配置随工厂条件而异,通常以煤气发生炉为主体,配有送风机、余热锅炉、旋风除尘器、洗涤塔、煤气排送风机、站内设备间的联络管道以及送往用户的煤气管道等。煤气发生炉种类较多,典型的有科柏斯式、英国动力煤气协会式、维尔曼式等。煤气发生炉的型号不同,但都是由炉体、加料装置、灰盘和炉算、排灰装置、探料装置几个主要部分组成。煤气发生站的设备安装顺序见图。~跳握 煤气发生站设备安装顺序图 煤气发生炉的安装多在煤仓、炉体操作平台等结构安装完成后进行。因安装场地受到限制,常采用卷扬机、桅杆、链式起重机、滚杠等起重机具将煤气发生炉设备运搬到安装位置。安装时先安灰盘托辊,并按图纸和规范要求调整好标高、水平度、中心线;然后安装灰盘,并根据灰盘标高安装灰盘传动装置;接着安装灰盘和炉壳之间的水封,水封高度不得低于设计尺寸,其中心应与灰盘中心重合。炉体有转动式和固定式两种。炉壳带有蒸气水套时,应对水套进行压力试验。加料装置有滚筒式和钟罩式。钟罩式加料装置应作静平衡试验,安装时要对准炉心,运转时应无卡阻且密封良好。探料多采用y射线,探料装置应由专业人员进行安装。余热锅炉常为火管式,采取垂直安装。应注意锅炉在搬运就位过程中不得受到撞击,以免锅炉两端管板胀口振松而发生泄漏。锅炉安装后应按专门规定进行耐压试验和气密试验。 煤气净化装置包括旋风除尘器和洗涤塔等槽罐构件,应按有关规范要求进行安装。塔体要垂直,方位要正确,底部要焊牢。 送风机多为离心风机,煤气排送风机多为轮机式。风机是高速转动设备,安装前应对风机叶轮作静平衡试验,并检查机壳的完好性;放置垫铁时,应对基础进行必要的研磨,以使接触良好。风机转子吊运中要严防变形或受到撞击,安装时要调好轴承间隙,并用平尺和水平仪在轴承瓦口面上检查机体的水平度。调整好电动讥、增速机的接手定心,用手盘车转动应灵活。 煤气发生炉及其配套设备安装完毕后,可进行各设备间联络管道的安装和风机、灰盘、加料装置、排灰装置、泵、阀门等的单体试运转及锅炉的烘炉和煮炉。联络管道安装后,要对整个煤气流经系统进行气密试验。全部合格后即可交付试生产。 (张泽湘)
  
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条