说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 目光评价
1)  visual evaluation
目光评价
2)  target evaluation
目标评价
1.
Application of hydrocarbon discharge quantitative analysis in target evaluation of South Yellow Sea Basin
油气充注定量分析技术在南黄海盆地目标评价中的应用
2.
The result of target evaluation shows that oil-gas coexistence in Well Gexi 4 is a favorable drilling target for further.
目标评价认为,疙西4号油气共存,是下步勘探的有利钻探目标;红台7号具备深盆气成藏条件,是小草湖地区深盆气勘探的突破口;疙北构造河道展布方向与构造倾向斜交,具备形成构造—岩性复合型油气藏的条件,是小草湖地区2000年深入研究的目标区。
3)  assessment item
评价项目
4)  project evaluation
项目评价
1.
Research on project evaluation of product development;
面向产品开发的项目评价研究
2.
Research on Road Construction Project Evaluation and Optimal Fund Allocation;
公路建设项目评价与资金优化配置研究
3.
Supervisory Information System Project Evaluation for the Guizhou Faer Power Plant;
贵州发耳电厂SIS系统项目评价
5)  project assessment
项目评价
1.
With the establishment of public finance framework and investment system reform,the traditional project assessment methods based dominantly on project expenses and benefits are facing a highly limited application.
随着公共财政框架的建立和投融资体制改革的发展,以项目费用和效益等经济性评价为主要内容的传统项目评价方法的应用局限性日益突出。
6)  project appraisal
项目评价
1.
Practice and ideas about project appraisal of Xiaolangdi immigrants;
小浪底移民项目评价的实践与思考
2.
Net Present Value(NPV) method is commonly used in conventional project appraisal.
净现值(NPV)法是传统投资项目评价中常用的方法,风险投资的特殊性决定净现值(NPV)法必须加以改进才能应用于风险投资项目评价中。
3.
Project appraisal needs to appraise the economic effect caused by project imlementation,but the value of ecological resources generally show through non-economic indicator,which may account for the inconsistency of measurement in project appraisal.
在项目评价中,往往需要评价项目对生态资源造成的经济影响。
补充资料:地下水水资源评价(见水资源评价)


地下水水资源评价(见水资源评价)


  d ixiashui shuiziyuan Ping】ia地下水水资源评价见水资源评价。
  
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条