1) system acceptance test
系统验收测试
2) system acceptance tests (SAT)
系统验收试验
3) experiment & measurement system
试验与测试系统
4) experimental test system
试验测试系统
1.
This paper presents the design of experimental test system of 100% low floor vehicle traction and assist system.
本文提出了一种应用于100%低地板车牵引辅助系统的试验测试系统。
5) performance test
验收测试
1.
Problem discussion of performance test of CEMS in coal-fired power plant;
燃煤电厂烟气排放连续监测系统验收测试问题探讨
2.
Correlative regulations of International Standard ISO and USA EPA about performance test of CEMS are illustrated simply.
简述了ISO标准和美国EPA关于烟气排放连续监测系统验收测试的相关规定,并详细介绍了我国燃煤电厂烟气排放连续监测系统验收测试方法。
6) acceptance testing
验收测试
1.
This paper is mainly discussing the merits, defects and applicable case of unit testing, integration testing and acceptance testing during software development.
本文着重讨论了在SDLC过程中单元测试、集成测试以及验收测试的优缺点和适用情况。
补充资料:测试结果可接受性的检查和最终测试结果的确定
测试结果可接受性的检查和最终测试结果的确定
check of the acceptability of test results and determination of the final test result
C凡(3)二3.3d,时,取此3个结果的平均值作为最终侧试结果;否则取它们的中位数作为最终测试结果。。,为重复性标准差(即在重复性条件下所得侧试结果的标准差)。 在口田T 11792一1989中还对重复性和再现性条件下所得侧试结果可接受性的检查方法和最终测试结果的确定做了详细讨论和规定。(马毅林)ceshi 11叩uo kejieshCxjxing d6 iiancha he zuizhong ceshi】i闪旧de que心ing测试结果可接受性的检查和最终测试结果的确定(checkof山eac,ptability of test,ults助ddsterminationofthefi耐testresult)在商品检验中进行一次测试的情形不多见,当得到一个测试结果时,所得结果不可能直接与给定的重复性标准差作可接受性的检查。对测试结果的准确性有任何疑问时都应再进行一次测试。所以,对两个测试结果进行可接受性的检查是一般的情况。 可接受性的检查,实际上是一种统计检验。任何两个测试结果只要能通过可接受性的统计检验即可认为是一致的,均可接受。比如,在重复性条件下,所得结果之差的绝对值(下称绝对差)不超过相应的重复性限r(见重复性和再现性)的值,则认为两个结果是一致的,均可接受;如果两个侧试结果的绝对差超过r,则认为它们是不一致的,必须增加测试。 按国家标准《测试方法的精密度在重复性或再现性条件下所得测试结果可接受性的检查和最终测试结果的确定》(GBIT 1 1792一1989),在重复性条件下,如果两个测试结果的绝对差不超过r的值,可取两个侧试结果的平均值作为最终测试结果。如果两个结果的绝对差超过r的值,并且测试费用较低,须再做两次测试。当4个结果的极差(即其中的最大值与最小值之差)不超过相应的临界极差c,瓜(4)二3.6a,时,取4个结果的平均值作为最终测试结果。如果两个结果的绝对差超过r的值,并且测试费用较高时,只须再作一次测试。当3个结果的极差不超过相应的临界极差
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条