说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 没安装上
1)  ot fixed
没安装上
2)  submerged installation
没水安装
1.
With an example of installation of sunken boxes of the first stage project of the Guang ao harbor district of Shantou Harbor,authors state a new construction method of submerged installation of sunken boxes,weighing about 1 000 tons,with lifting boats,weighing about 200 tons.
以汕头港广澳港区一期工程沉箱安装为实例,介绍了200t起重船没水安装近千吨沉箱的一种新工艺。
3)  submerged caisson
没顶安装
4)  offshore installation
海上安装
1.
Special attention should been paid to the requirement from the drilling and completion works during the engineering, fabrication and offshore installation of platforms, single point mooring system, subsea pipeline as well as drilling and completion is extremely important.
在平台、单点系泊、海底管道和电缆的设计、建造和海上安装过程中,需要特别重视钻完井作业的要求。
2.
The platform was installed by lifting instead of conventional launch method, which significantly improved the offshore installation efficiency.
在中国海洋石油总公司平湖工程项目组的组织管理下,海上安装承包商HEEREMA成功地完成了海上安装工作。
3.
This article introduces briefly the application,compositive innovation,offshore installation and project management of module drilling rig in Chinese offshore oil fixed platform and gives some advices to Chinese homemade module drilling rig s development.
介绍了我国海上固定式平台模块钻机的应用、集成创新、海上安装和项目管理等,对我国海上固定式平台模块钻机的国产化提出了建议。
5)  installation above water
水上安装
6)  installation on board
船上安装
补充资料:设备的安装——设置安装基准
设备的安装——设置安装基准
 

 

 
文章编辑:moji
文章来源:
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条