说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 轧制管材
1)  drawn and rolled tube
轧制管材
2)  drawn and rolled tubes
拉制轧制管材
3)  tube rolling mill
管材轧机
4)  cold reduction of tubes
管材冷轧
5)  Bar rolling
棒材轧制
1.
The existing problems in the feeding steel control and multiple lengths optimization in the bar rolling process at Xinsteel bars plant are analysed.
详尽分析了新钢棒材厂棒材轧制过程中倍尺优化和上钢控制中存在的问题,提出了新的控制方案和改进方法。
6)  rolling sheet
轧制板材
1.
Heat treatment of Mg-Zn-Y-Zr alloy rolling sheet
Mg-Zn-Y-Zr合金轧制板材的热处理
2.
The results show that the grains in the single direction rolling sheet is changed from strip to equal axis shape because of the recrystallization and twin crystals disappearance during annealing heat treatment,and there are some fine grains although part grains are grown.
研究不同退火工艺下AZ31镁合金轧制板材显微组织以及冲压性能。
补充资料:有色金属管材轧机安装


有色金属管材轧机安装
erection of tube rolling mill for nonferrous metal

卯UsejlnshUgu加CQ冲haji QnzhuQng-燕薰暴或然…岌藻 备,轧机的型式和产晶有多种,但其主体结构基本相 同。一般都由传动系统、工作机架、回转送进系统、芯_ 杆装置和退出系统、授料机构、出料系统、液压润滑系 统7部分组成(图1),华沟…_命升幽叠勤…「簇丈募_缪澎糕默氰默: 锤方法找正机座中心线;用长平尺和框架水平仪测量 机座滑道水平度几‘图幼‘亦可用精密经纬仪和水平仪 直接测量机座的水平‘标高租中心线。场应检查并调整 机座两根齿条中心与轧辊轧制孔中心的尺寸。_二 (2)工作机架安装。测量并调整工作机架的中心, 水平度和垂直度。由于工作机架工作时做往复运动,需 在中间和前、后极限三个位置进行各项安装精度测量· 以确保全行程运动的准确性福在机架和连杆连接后…,手 动盘车使机架全行程往返数次,并在前后两个极限位 置量取上下轧辊平面夹角、一般情况下两个夹角数字只\。口}一气_\ 、沪 图2机座找平找正方法示意图 l一滑道;2一长平尺;3一框式水平仪;4一方木及中心点; 5一钢线;6一精密经纬仪;7一精密水准仪;8一线架不同,常在184’一215’之间。将测得的二个夹角数字与设备技术文件对照,应在允许误差范围内,如超差则应查找影响因素并加以消除。 (3)回转送进机构安装。摇杆角度的调整要求是:当工作机架在后极限位置时,摇杆的轴线为零,利用调节联轴器口_.和外套啮合的变化,使摇杆中心线向前移9。左右,准确符合设备技术文件的要求。』芭杆为细长件,安装时要用带平衡滑轮的吊具进行多点吊装,防止产生弯曲变形。 〔4)液压润滑系统安装。液压润滑油路要经脱脂、酸洗和钝化处理,并用氢弧焊焊接管道,以油冲洗,使系统达到设计要求的清洁度标准。 试运转轧机本体安装完毕,经分部调试后即可进行整机试运转。先把送进液压转换装置放在“快速退回”位置,在套筒卡盘不参与工作情况下,开动工作机架,试验工作机架与回转送进机构运行的谐调性和平稳性。继而使套筒卡盘快速往返若干次,再把进给转换液压缸置于“进给”位置,使套筒卡盘全行程移动。芯杆小车需作短行程、中行程和长行程往返试验。各液压操纵装置、出料台拨料机、芯杆小车锁紧装置、前卡盘卡紧装置等同时协调动作。上述一切运作正常后,启动主传动电动机,使工作机架和回转送进机构连续运转4h。经检查正常无误,试运转即告结束。 (高伟)
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条