说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 正落差
1)  normal throw
正落差
2)  elevation difference
落差
1.
The study results showed that the effect of density on laminar bottom in elevation difference pipeline is distinct and can not been ignored.
研究结果表明:密度对大落差管道顺序输送过程中层流底层的影响,比较明显,不可忽略。
2.
An intermixing model of elevation difference batching transportation is established.
结果表明,密度对大落差管道顺序输送过程中层流底层的影响比较明显,不可忽略。
3)  drop [英][drɔp]  [美][drɑp]
落差
1.
Six new faults have been discovered in addition to modifying the location and drop of the original faults,furthermore,a better grasp of the distribution,the development status,the scope and the stretch of all the faults in opencast coal mine are available, which will give a much more reliable geological gu.
结合地质勘探、数字地震勘探和生产地质素描 ,对一号露天矿构造进行了详细的分析研究 ,发现了六条新断层 ,并对原有的几条断层的位置、落差进行了修改 ,进一步掌握了一号露天矿断层分布及产状、规模、延伸的关系等 ,为露天矿开采提供了可靠的地质保
2.
The feasibility research on two-cavity in one mould to simple forgings,forgings with a big section difference and forgings with drop is concerned in the paper.
对简单锻件、截面差变化较大锻件和带落差锻件等3类锻件进行了一模两件锻造分析、计算和设计。
4)  fall [英][fɔ:l]  [美][fɔl]
落差
1.
In free status, dry shrinkage of expansive concrete with expansive agent is the same with common concrete; in restrain status, compressive stress is the main reason causing dry shrinkage fall increasing in expansive concrete; the technical measures which are effective for reducing common concrete dry sh.
本文通过试验证明,膨胀混凝土在水中养护且膨胀稳定之后,处于干燥环境下的失水收缩依然遵循杨-拉普拉斯方程,自由状态下,掺膨胀剂的膨胀混凝土与普通混凝土干燥收缩相同,限制状态下膨胀混凝土中的压应力是导致试验中干燥收缩落差增大的主要原因,能够减少普通混凝土干燥收缩的技术措施—如掺减缩剂或降低水胶比同样能够减少限制状态下膨胀混凝土的干燥收缩落差。
2.
The industrial experiment and research have been made to air delivery of cement(flyash) with a large fall.
对水泥(粉煤灰)大落差气力输送进行了工业性试验、研究,提出可行的设计方案,摸索出了有效的运行方式,该项技术已成功运用在小湾水电站工程中。
5)  Throw [英][θrəʊ]  [美][θro]
落差
1.
A New Method of Predicting throw and Strikeextended Lenghth of Coal Fault;
预测“煤断层”的落差和走向长度的新方法
6)  adjusting factor-fall exponent method
校正因数-落差指数拟合法
1.
For the stage-discharge relation influenced by the soar or fall rate of flood, the water tipping of the downstream as well as the artificial hydraulic engineering, a method, which is called adjusting factor-fall exponent method based on computer synthesizing, has been put forward.
对受洪水涨落率影响、下游支(干)流洪水顶托影响及人工水利工程影响的水位流量关系,提出了用计算机综合处理的校正因数-落差指数拟合法,较好地解决了水位流量关系单值化的问题,满足现行的《水文资料整编规范》要求,具有一定的推广价值。
补充资料:落差
1.因河床高度的变化所产生的水位差数。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条