说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 临时高压系统
1)  temporary high service system
临时高压系统
2)  fire water supply system of temporary high pressure
临时高压消防给水系统
3)  temporary system
临时系统
4)  temporary high voltage fire
临时高压火灾
5)  high-voltage system
高压系统
1.
The experience to reform the 35kV high-voltage system of 110kVA substation of Xuan Steel without stopping operation is analyzed and discussed, it is pointed out that safe construction and operation can be guaranteed if superior device selected and well-conceived safe measures carried out.
对宣钢供电系统110kV变电站35kV高压系统边运行边施工改造经验进行了分析探讨,指出选用优良的设备、制定周密的安全措施,能够确保施工、运行安全。
2.
It is emphasized that the determination of the harmonic limit value for a high-voltage system should be based on the tolerance capacity of a low-voltage appliance toward harmonics (or a generally recognized value) and the harmonic penetration laws.
4kV之间的谐波渗透模型 ,提出了高压系统谐波限制值的确定应以低压配电系统中电机电器对谐波的承受能力 (或公认的限制值 )和谐波渗透规律为依据的观点 ,并算出了在电源至负荷间的压降为 5 %的条件下 ,从 1 1 0kV到 0 。
6)  high pressure system
高压系统
1.
Combined with fire protection code in architecture design and actual situation of Yangquan city the matters needing attention in fire fighting design in multistory buildings are discussed according to the distribution of fire cock, pump adapter in high pressure system and other aspects.
结合建筑设计防火规范和阳泉市实际情况 ,探讨了多层住宅的消火栓布置 ,底商住宅的定性问题 ,常高压系统水泵接合器的设置等几个消防设计中值得关注的问题 ,使设计人员更透彻地理解规范 ,设计出更实用的消防设计方
补充资料:关于临时建设和临时用地

临时建设是指必须限期拆除、结构简易、临时性的建筑物、构筑物、道路、管线或其他设施;临时用地是指由于建设工程施工、堆料或其他原因,需要临时使用并限期收回的土地。批准临时建设和临时用地的使用期限,一般均不超过两年。
临时建设和临时用地都对城市规划的实施产生重要的影响,因此,城市规划行政主管部门必须对城市规划区内的临时建设和临时用地进行严格的规划管理。任何单位和个人需要在城市规划区内临时使用土地或进行临时建设都应当征得城市规划行政主管部门的同意,不得影响城市规划的实施。
鉴于临时建设和临时用地的情况比较复杂,各地的管理体制和管理条件又不尽相同,因此,《城市规划法》第三十三条规定:“在城市规划区内进行临时建设,必须在批准的使用期限内拆除。临时建设和临时用地具体规划管理办法由省、自治区、直辖市人民政府制定。”
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条