1) nuclear power fluctuation
核功率涨落
2) rising/fall rate
涨落率
1.
The rising/fall rate of design flood graph is also the rising/fall rate of design H~Q curve,based on which the design H~Q curve can be determined.
探讨了水利工程设计时常采用一条所谓综合H~Q曲线存在的误区,H~Q和洪水一样,有设计洪水,就有相应的设计H~Q曲线,它是和设计洪水配套的,设计洪水过程线的涨落率,也是设计H~Q的涨落率,由此求设计H~Q曲线。
3) fluctuation in exchange
汇率涨落
4) mean fluctuation power
平均涨落功率值,平均峰谷功率
5) flood rate of rising and falling
水位涨落率
6) fluctuation rate of flood
洪水涨落率
补充资料:电导率(见电阻率)
电导率(见电阻率)
conductivity
d!日nd日O}已电导率(eonduetivity)见电阻率。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条