说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 再生塔(柱)
1)  regeneration column
再生塔(柱)
2)  actifier column
再生柱(塔)
3)  solvent recovery column
溶剂回收柱,溶剂再生塔
4)  regeneration tower
再生塔
1.
Analysis and protection for MDEA regeneration tower corrosion in desulfurization unit
脱硫装置MDEA再生塔腐蚀分析与防腐措施
2.
Much HF acid corrosion and leakage frequently has happened in a hydrofluoric acid regeneration tower made by Monel alloy during a short run in one alkyl benzene unit located in Fushun,which does not correspond with the natural combine rule of excellent anti-corrosion between Monel alloy and HF acid.
抚顺某HF酸烷基苯Monel合金再生塔短期内频繁发生HF酸腐蚀泄漏,严重违背蒙乃尔合金与HF酸耐蚀优异的天然结合规律。
3.
This text mainly studies hydrofluoric acid regeneration tower which has been used for many years.
主要研究氢氟酸再生塔使用多年以后,根据气相和液相部位的壁厚对比试验,金相组织分析,扫描电镜分析以及能谱分析,评定了蒙乃尔合金在酸再生塔中低部液相部位和顶部气相部位的腐蚀性能。
5)  regenerator [英][ri'dʒenə,reitə]  [美][rɪ'dʒɛnə,retɚ]
再生塔
1.
Uses new liquid distributor and structured packing to replace old tray distributor and bulk packing to make technical revamp to Benfield CO2 removal regenerator successfully.
应用新型液体分布器及规整填料替换老式盘式分布器和散堆填料,对本菲尔脱碳再生塔成功地进行了技术改造。
2.
In view of the flooding problem existing commonly in gas treatment plant,focused on the CNOOCC's aMDEA03 process and combined the running experiences of the other CO2 removal units,the reasons causing the flooding of MDEA solution regenerator were classified and discussed,and the optimized experiences and precautionary measures based on the advance control were summarized.
针对困扰净化装置的液泛问题,以中海化学aMDEA03脱碳工艺为考察重点,结合其它净化装置的运行经验,对再生塔液泛的原因进行了归类和分析,总结了基于事前控制的优化经验与预防措施。
3.
In allution to serious corrosion problems of shell and inner head at the impact area of poor solution of de-sulfur ammonium liquid regenerator and at the outlet of reboiler,the caused reason of corrosion was analyzed from aspects of incoming medium of column,polluted material in circulating ammonium liquid,system load and structure etc.
针对脱硫胺液再生塔贫液冲击区和重沸器出口处壳体、内封头严重腐蚀的问题,从入塔介质、循环胺液中污物、系统负荷、再生塔重沸器结构等方面分析了导致腐蚀的原因,从工艺、设备、操作管理等方面提出了防范措施。
6)  MDEA regenerator
MDEA再生塔
1.
The risk-based inspection(RBI) technique was used to analyze the risk of MDEA regenerator,the failure possibility,consequence and risk grade of each component of the regenerator were obtained.
运用基于风险的检验技术(RBI)对MDEA再生塔进行了风险分析,得到了塔体各部件具体的失效可能性、失效后果和风险等级。
补充资料:鳌柱塔
鳌柱塔
鳌柱塔

鳌柱塔原是招宝山十二景之一景。即“鳌柱插天”。则于历史原因,原鳌柱塔早已损毁无存。为恢复这一历史遗迹,镇海历届领导在筹资方面做了很多工作。

新建鳌柱塔坐落在招宝山北峰顶上,其下面南坡上屹立的便是观音阁圣地。

鳌柱塔由侨胞捐资和政府拨款共同建设,花资约600万元。由天津大学规划设计。主体工程自1995年5月破土动工,1998年10月竣工,管理房等附属工程1999年春节前完工,当年春节正式开放接待游客。

鳌柱塔占地361平方米,为仿宋建筑,钢筋混凝土框架结构,锚岩桩基础,按抗震抗台规范设防,塔身净高57.6米,七层八角,青铜塔刹顶,塔内除设有步行步阶外,还设有电梯,方便年老游客。

鳌柱塔是镇海口的制高点,登塔远眺,望海观潮,领略海天风光,东海诸岛若隐若现.俯视城镇乡村、炼油厂、镇海发电厂、北仑港码头尽收眼底;镇海城镇乡村,历历在目;宁波市区现代化港口城市隐约可见;逶迄曲折的甬江彩带把宁波、镇海连起来。 文字

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条