说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 变矩器加注压力分接头
1)  converter charge pressure tap
变矩器加注压力分接头
2)  converter charge pressure
变矩器加注压力
3)  transformer tap
变压器分接头
1.
This paper,starting from the point of ensuring the normal operation of electrical equipment at the end of the power system and the operations under the maximum load and the minimum load in the system,analyzes the reasonable options of the transformer tap in theory and illustrates calculation method,and then summarizes and verifies the voltage level after the selection.
本文以保证电力系统末端用电设备的正常工作为出发点,针对系统在最大负荷和最小负荷的两种运行情况,从理论上分析和探讨了变压器分接头的合理选择方法,并用示例进行了计算方法的说明,对选择后的电压水平进行了总结和验证。
2.
cotrol of transformer tap using the artificial neural network.
本文提出了一种利用人工神经元网络实时控制变压器分接头的新方法。
4)  load tap changer
变压器分接头
1.
A fuzzy linear programming method based on SCADA and used for the combined control of load tap changer and switching over shunt capacitors bank is proposed, to solve the real time vol/var control problem in a distribution substation.
提出一种基于 SCADA的综合控制变压器分接头和并联电容器组的模糊线性规划方法 ,进行配电站电压无功实时监控。
2.
In this paper a fuzzy linear programming method used for the combined control of load tap changer and switching-over shunt capacitors bank is proposed, to solve the real time vol/var control in a distribution substation.
本文提出了一种综合控制变压器分接头和并联电容器组的模糊线性规划方法,进行配电站电压无功实时监控。
3.
Having the ways of capacitor switching and LTC (load tap changer) changing, a fuzzy linear program.
调控策略上,本系统综合升、降变压器分接头和投、切电容器这两种调控手段,采用了计及多因数的模糊线性规划法来研究基于DSP(TMS320F240)的变电站电压、无功的实时控制。
5)  tc connector
变矩器接头
6)  On line tap changing transformer
有载调压变压器分接头
补充资料:器分
1.谓人所具有的资质与才能。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条