1) supervisory charge
监工费用
2) supervisory and overhead charges clause
监工及基本费用条款
3) monitoring cost
监督费用
4) expense supervision
费用监理
5) time-cost
工期-费用
1.
For solving time-cost optimization problems of PERT(Program Evaluation and Review Technique) network plans,the model was represented with linear programming,and a particle swarm optimization algorithm was used to solve this problem.
针对工程项目PERT网络计划工期-费用优化问题,尝试引入粒子群算法。
2.
Based on analysis of uncertainties in both project completion limit and expense in project negotiation scheduling of virtual enterprise, a multi-issue time-cost stochastic model was put forward.
在分析虚拟企业项目协商规划的工期与费用的不确定性的基础上,提出了多属性工期-费用随机项目模型,以及工期-费用部分并行协商规划算法,以期望工期费用为优化目标,结合示例阐述其计算过程。
6) construction cost
工程费用
1.
On the application of value engineering in construction cost control;
浅谈价值工程在工程费用控制中的应用