说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 客户验收标准
1)  Customer Acceptance Criteria
客户验收标准
2)  customer acceptance lab
客户验收标签
3)  Acceptance criteria
验收标准
4)  acceptance standard
验收标准
1.
: This article describes the basic principles of eddy current test and analyzes the acceptance standards of eddy current test for boiler tubes at home and abroad.
叙述了涡流探伤基本原理,分析了国内外锅炉钢管涡流探伤验收标准,提出了锅炉钢管涡流探伤验收等级标准。
2.
In this article,authors discuss the acceptance standard of prestressed anchor bolt with large diameter and high strength.
该文对大直径高强度预应力锚栓验收标准进行了探讨与研究。
3.
Three structure types of arched corrugated metal roof are introduced and combined with practical work the construction technology of this structure is discussed as well as related acceptance standards.
介绍了金属拱形波纹屋面结构的三种类型 ,结合工程实例 ,就该结构工程的施工工艺流程进行了论述 ,提出了其验收标准 ,经过三年使用 ,拱面未出现变形、渗漏现象 ,取得了令人满意的效
5)  acceptance criterion
验收标准
1.
The shortcomings of the current NDE standards are pointed out, and a new flaw acceptance criterion is presented, which is different from the current ones based on fracture mechanics.
对我国现行的常规压力容器无损检测验收标准做了分析,指出了其中存在的问题并提出了改进设想。
6)  customerization and standard
客户化和标准化
补充资料:承包人要求发包人组织工程验收,包括隐蔽工程的验收和工程竣工的验收的权利
承包人要求发包人组织工程验收,包括隐蔽工程的验收和工程竣工的验收的权利:根据我国《合同法》的第278条规定隐蔽工程在隐蔽以前,承包人应当通知发包人检查。发包人没有及时检查的,承包人可以顺延工程日期,并有权要求赔偿停工、窝工等损失。根据《合同法》第279条中的规定建设工程竣工后,发包人应当根据施工图纸及说明书、国家颁发的施工验收规范和质量检验标准及时进行验收,因此在工程完成时组织竣工验收,也是发包人的主要义务。建设工程竣工验收合格后,方可交付使用,未经验收或者验收不合格的,不得交付使用,发包人对未经验收的工程,提前使用或者擅自动用的,对发现的质量问题由发包人自行承担责任。-------------《民法》第一版,第514页。魏振瀛;《合同法》的第278条
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条