说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 走路
1)  Walking [英]['wɔ:kɪŋ]  [美]['wɔkɪŋ]
走路
2)  traveling circuit
行走电路
3)  feed route
走刀路线
1.
Taking NC macro program in spherical ring-cutting as example,the paper puts forward the convenience of NC macro program in programming for complicated components,and points that the design of feed route is critical in NC programming.
以环切法球面加工的数控宏程序编制为例,提出了在编制复杂零件的数控程序时采用宏程序的便利性,同时指出了走刀路线的设计是数控编程的关键。
2.
In the process of drawing up the technology route of numerical- controlled machine toolsin processing parts,if limited to the Parts themselves,the feed route drawn up may not bethe shortest and it is possible that difficulties may arise in programming.
在制定数控机床加工工件的工艺路线时,如果仅局限于工件本身,制定出的走刀路线可能并非最短,并有可能造成编程麻烦,本文介绍了如何从数控机床实际具有G00路径、数控系统实际采用的插朴方法以及工件本身的几何形状特点三方面着手,综合分析制定实际最短走刀路线,以充分发挥数控机床的技术经济效益。
4)  tool path
走刀路径
1.
, the reconstruction of the free form surface with discrete points based on a special Hermite's interpolation; the definition of the hogging areas by means of the curved surface intersection and tool path arrangements.
此算法根据测量的离散数据点进行自由曲面造型,通过曲面求交获得荒加工区域,剔除原有无用的走刀路径,并据此排列出优化的刀位轨迹。
2.
First, use"birth and death"element and dynamic load step technique to simulate the material removal and tool path respectively, analyzed the machining deformation and effect rule caused by the tool route under the coupling of initial residual stress, fixturing stress and milling residual stress.
首先,利用单元生死技术、动态载荷步分别模拟铣削加工过程中材料去除和走刀过程,分析了初始残余应力、装夹应力和铣削机械应力耦合状态下走刀路径对加工变形大小及其分布状况的影响规律。
5)  line corridor
线路走廊
1.
The power transmission line corridor is very narrow in East China for San-Hu DC transmission line,the cost of residential house clearing is expensive as the polar conductors horizontally arranged.
目前我国常规的±500 kV直流线路均按极导线水平排列设计,但对于华东这种线路走廊比较拥挤的地区,若采用极导线水平排列,将占用较宽的线路走廊,由此造成的民房拆迁费用会大大增加。
2.
Transmission line corridor problem is prominent during current line constructions in our country.
输电线路走廊问题是目前我国输电线路建设中遇到的突出问题。
3.
The situation of large load density and lack of line corridors of East China area is worsened by increased difficulties in building dismantling and substantially increased economic compensation,which has seriously impeded the grid development.
华东地区负荷密度大,线路走廊匮乏,近年来拆迁难度和经济补偿大幅增加,已严重制约电网发展。
6)  bus routing problem
路线走向
1.
In this paper,the mathematic model of bus routing problem,which takes the maximum sum of dynamic nonstop passengers with bending modulus restricted,is established and the solution algorithm based on ant colony algorithm is developed.
建立了新的公交路线走向的数学模型。
补充资料:走路
1.逃奔之路。 2.出路;通道。 3.穿堂;过道。 4.行走。 5.动身。 6.指解聘﹑解雇。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条