说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 明挖覆盖工法
1)  CCM(Cut and Cover Method)
明挖覆盖工法
2)  excavation after covering
盖挖工法
3)  cut and cover tunneling
明挖法施工
4)  topdown construction
盖挖逆作法施工
1.
The application of dual-purpose pile in topdown construction can not only save costs,but also make the mechanic condition of substructure walls more rational.
在盖挖逆作法施工中采用"一桩两用"技术,不仅可节约大量费用,而且使地下结构的外墙的受力状态更为合理。
5)  overriding declaration
覆盖声明
1.
We have proposed a process ontology model by adopting an inheritance mechanism with overriding declaration and monotonic inheritance.
通过引进带覆盖声明的、单调性的继承机制,建立了一种新的过程本体论模型。
6)  Covered excavation
盖挖法
1.
A covered excavation was adopted, which not only eliminated the problem of traffic blockage but also protected the adjacent buildings and services above the foundation pit, with much shorter construction period.
通道采用了盖挖法施工 ,既解决了地面全断面行车 ,又确保基坑上部管线及邻近建筑物的安全 ,减少了基坑施工周期。
2.
Combined with shallow tunnel of Maoshan west tunnel,this paper compares the covered excavation with open-cut method on technology and economy.
并对盖挖法施工方案及施工工艺进行了介绍。
补充资料:暗挖法
      见隧道及地下工程施工方法。
  

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条