说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 承压载荷及应力
1)  bearing loads and stress
承压载荷及应力
2)  bearing stress
挤压应力,支承应力,承载应力;轴承负荷强度
3)  bearing load
承压载荷
4)  prestress length caused load
荷载预压应力区
1.
It is proved that there is still a prestress length caused load in composite frame beams, which is beneficial to the shearing composite beam.
通过对两榀双层双跨钢筋混凝土叠合框架(KJ—1,KJ—2)和-榀整浇框架(KJ—3)的试验,分析了叠合框架梁的受力性能,提出了叠合框架梁叠合面破坏机理及防止叠合面破坏的构造措施,证实了二次受力叠合框架梁中仍然存在荷载预压应力区,它对叠合梁抗剪有利。
5)  Static load-bearing
静荷承载力
6)  load stress
荷载应力
1.
Analysis of influence by differential settlement of foundation to cement concrete pavement load stress;
不均匀沉降对水泥混凝土路面荷载应力的影响
2.
The law that the load stress at the loading position critical to fatigue loss varies with the structural parameters of CRCP is studied at different intervals of the cracks, with relevant proposals for confirming those parameters.
研究了不同CRCP裂缝间距下,CRCP疲劳损耗临界荷位处的荷载应力随路面结构参数变化的规律,对路面结构参数的确定提出了相应的建议。
补充资料:预压法
      对软土地基预先加压,使大部分沉降在预压过程中完成,相应地提高了地基强度。预压法适用于淤泥质粘土、淤泥与人工冲填土等软弱地基。预压的方法有堆载预压和真空预压两种。
  
  堆载预压  在地基上堆放重物(水、土、砂、石等)进行预压。当堆载超过计划建造的建筑物荷载时,称为超载预压。为了防止堆载时压坏地基,需分级加载,即:在前一级荷载作用下地基基本固结后,再施加下一级荷载,直至达到设计荷载为止。
  
  预压所需时间的长短取决于地基土层的渗透特性、厚度和预压荷载的大小等因素。这些因素可以根据地基固结理论进行计算预计。施工时应监测地面沉降和土中孔隙水压力的消散情况,对预压加以控制。
  
  为了加速厚层软土的固结,缩短预压时间,应设法改善厚层软土的排水条件。最常用的排水的方法是在地基中按一定间距作孔,孔内填砂以形成砂井(图1)。然后在地面加铺砂垫层加以沟通。近年来,土工织物日益发展,已开始采用纤维编织的袋装砂井和在排水纸板上发展起来的塑料板排水。
  
  
  堆载预压早在50年代就广泛地应用于铁路、公路路堤、码头和岸坡的地基处理;还应用于土坝、水闸、房屋、冷藏库和油罐等工程的软基处理。如中国的苏北大浦和汉江杜家台两个大型水闸工程,经过预压后,大大减少了闸室和岸墩的沉降量;又如上海地区采用3万米3油罐充水预压改良地基,取得了显著效果。
  
  真空预压  以大气压作为预压荷载(图2),对地基土进行抽气,在土中造成一定的真空度,形成大气压力与真空压力的差值作用,将土中一部分水抽出,从而使地基土固结而加固。如果设置排水砂井,还可将孔隙内的水加速排出。
  
  
  此法首先由瑞典皇家地质学院于1952年提出。到80年代,中国也进行了室内外试验,并且已经开始在工程中应用。
  

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条