说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 走过隧道。
1)  Walk through the tunnel.
走过隧道。
2)  walk way,gangway,access way
走道,过道
3)  Zoumaling tunnel
走马岭隧道
1.
Study on the Mechanical Properties of Rock Mass Structural and the Stability of Surrounding Rock of Zoumaling Tunnel;
走马岭隧道岩体结构特征及围岩稳定性研究
2.
Based on the complexity of geological environmental conditions of Zoumaling tunnel,it is necessary to monitor the deformation of deep surrounding rock.
系统地介绍了隧道围岩变形监测的原理和方法分析;并以走马岭隧道施工过程的深部围岩变形监测为依据,获取围岩动态综合信息以分析围岩变形规律,指导施工;提出围岩变形监测为隧道大变形预测、优化二次支护时间等提供科学依据和施工建议,是岩土工程信息化设计、施工的重要手段。
4)  passing through tunnel
通过隧道
1.
Research purposes:Taking erecting heavy-tonnage box girder with bridge girder erecting machine in Bidding Z8 section of Shijiazhuang-Taiyuan Railway Passenger Dedicated Line as an example,the analyses of the influencing factors on and necessity of erecting girder with bridge girder erecting machine while passing through tunnel are made.
研究目的:为了解决客运专线架桥机通过隧道架梁施工的技术难题。
5)  sub-sea tunnel
过海隧道
1.
On the application of the brine freezing method in the rush emergency of the sub-sea tunnel
盐水冰冻法施工在过海隧道抢险中的应用
2.
Based on the design and construction experience of river-crossing tunnels,sub-sea tunnels,long tunnels and high-speed railway tunnels,the author concludes that the reasonable option for Taiwan Strait sub-sea tunnel is railway tunnel.
从国内外江、河、海底隧道的建设经验出发,根据长隧道及高速铁路隧道的设计、施工经验,论述了台湾海峡海底隧道采用铁路隧道方案的合理性;给出了台湾海峡海底隧道的断面形式、断面面积及洞门形式建议方案;提出了台湾海峡海底隧道选择施工方案要点;介绍了国内江河海底隧道的建设情况;重申审核工程修建好坏的理念,及修建过江、过海隧道比桥梁的优点;最后给出了修建海底水下隧道急需深入研究和解决的重大关键技术问题。
6)  River-crossing tunnel
过江隧道
1.
Study on building excavation for Pukou open-cut river-crossing tunnel of Nanjing
南京过江隧道浦口明挖段基坑降水方案研究
2.
One of the main reasons for the longitudinal deformation of river-crossing tunnels is riverbed scouring and siltation.
河床冲淤是引起过江隧道纵向变形的一个主要原因。
补充资料:走道
1.行路;走路。 2.出入的通道。 3.指江河的通路。 4.谓耍弄花招。 5.犹言走江湖。 6.方言。指改嫁。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条