说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 长沙竖井
1)  Cheung Sha Shaft
长沙竖井
2)  Harbour Island Shaft
白沙头洲竖井
3)  shaft well
竖井
1.
The most of shaft wells of TGP s permanent shiplock characterize as large section, shaft well group, double steel bar, and large amount of accurately embedded metal structure and especially for the lower shiplock chamber section, the structure is complicated and the steel bar is dense.
三峡水利枢纽永久船闸竖井多为大断面、多井群组合结构,且为双层钢筋,又有大量高精度要求的金结埋件,尤其是下部闸室段结构复杂,钢筋密集,因此工作量大,施工干扰大,施工难度大。
2.
The outfall pressure shaft well in the third-step pumping station of main canal of Wanjiazhai Huanghe Water Transfer Project in Shanxi Province is lined with reinforced concrete and constructed by using hydraulic climbing form.
山西省万家寨引黄工程总干三级泵站出水压力竖井为钢筋混凝土衬砌 ,采用了液压滑升模板施工 ,节省了多次立模和拆模工序 ,加快了施工进度。
3.
In order to protect the cast concrete at the shaft well section of the power tunnel against corrosion by several strong corrosive mediums,a protection project at the outer sidewall of the shaft well is needed.
“6 35”水利枢纽已浇筑的发电洞竖井混凝土受到多种强腐蚀介质的侵蚀影响 ,需在竖井外壁进行加强性工程防腐处理 。
4)  silo [英]['saɪləʊ]  [美]['saɪlo]
竖井
1.
Application of gyroscope in the directional silo measure;
陀螺仪在竖井定向测量的应用
2.
Numerical Simulation of Fan Influence in Long and Large Road Double-silo Tunnel Intake and Exhaust Ventilation Mode;
长距离大直径公路隧道双竖井送排式通风中风机影响的数值模拟
3.
The Protection Methods and Construction Techniques for Under Drain and Silo of Karez;
坎儿井暗渠和竖井防护措施及施工技术
5)  vertical shaft
竖井
1.
Blasting vibration control for rock excavation of vertical shaft of south station hall in Guangzhou east railway station;
广州地铁东站南站厅竖井石方爆破震动控制
2.
Excavation construction technology of Yanmenguan 2# vertical shaft;
雁门关2号竖井开挖施工技术
3.
Construction scheme optimization of vertical shaft in metro construction;
浅谈地铁竖井施工技术方案的优化
6)  vertical well
竖井
1.
Using the basic design theory of vertical well and summing up with the experiences in several vertical well constructions in tunnel engineering, the paper puts forward a calculation method for the lateral pressure of vertical well in the loess area.
通过对汉村隧洞、富平王寮隧洞等多项工程5个施工竖井设计的分析总结,根据竖井设计的基本理论,给出了黄土区施工竖井周围压力的计算方法。
2.
In this article, authors firstly introduce the design and construction of these vertical wells, analyze reasons of their sedimentation from such aspects as dimensions, practical construction situations, and soil features and so on, and finally state several sedimentation treatment measures adopted in construction.
介绍了竖井的设计及施工方法,然后从尺寸大小、实际施工工况以及土层性质等几方面分析了沉降的原因,最后介绍了工程中所采用的几项沉降治理措施,并结合实测沉降数据分析了各项措施的应用效果。
3.
Then the requirement of similar speed field is deduced and the subsectional model experiment is put forward on the basis of the peculiarity of pressure distribution in continuous state vertical well.
以相似理论为基础,对城市隧道自然通风速度场进行分析,建立了城市隧道自然通风速度场相似的数学模型,推导出模型与原型速度场相似的条件;以连续竖井的静压分布特性为基础,提出分段模型实验;对实际城市隧道自然通风效果进行了评价,对竖井型城市隧道自然通风具有一定的理论和工程指导意义。
补充资料:长沙


长沙
Changsha

  长 沙刘社爱摄ChangshQ长沙(C hangsha)中国湖南省会,历史文化名城,军事重镇。位于湖南省东部,湘江下游。辖东、西、南、北、郊5区和长沙、望城、宁乡3县。面积6 810平方千米,人口423.64万,其中市区面积367平方千米,人口138.71万(1993)。 春秋战国为楚城邑。秦为长沙郡。西汉为长沙国都。东汉复为长沙郡。三国吴分民沙郡为湘东、湘西两郡。晋永嘉元年(307)复设长沙郡,并置湘州。隋开皇九年(589)撤湘州,改长沙郡为潭州,大业三年(607)复称民沙郡。唐初复为潭州。五代为楚国都,改潭州为长沙府。元为潭州路,后改为天临路。明复称长沙府。清康熙三年(1664)置湖南布政使司,为湖南省治。1933年设长沙市。1949年为省辖市。 地处湘东丘陵盆地区,地势南高北低。西依雪峰山,东靠连云山、罗霄山。市区海拔44米,西部是岳麓山、凤凰山、天马山等低山丘陵,其中岳麓山海拔295.4米,为市区制高点。东部有阿弥岭、杨家岭等一系列低岗,南部透遁着大片红色岗地,有金盆岭、黄土岭、东瓜山、妙高山、回龙山为屏障。北部是开阔的冲积平原。湘江由南向北纵贯市区,注人洞庭湖,枯水期水深1一15米,其西岸的靳江、伪水与东岸的浏阳河、捞刀河均为其支流,洪水期4-7月。属北亚热带湿润季风气候。年平均气温172℃,1月平均气温4.7℃,7月平均气温29.4℃。年平均降水量1 412毫米。矿产有硅砂、石灰石、煤、磷矿石、铁矿石等。长沙为湖南省重要的工业基地。以机械、化工、食品、纺织等工业为主。湘绣是中国四大名绣之一。农副业产品以水稻、生猪、鲜鱼_为主,盛产茶叶、柑桔、油菜籽等。是全省交通枢纽。北京一广州铁路纵贯,石门一长沙铁路正在建设中。公路干线通江西、湖北、四川、贵州、广东等省。湘江长沙港有泊位102个,长沙以下常年可航300吨船舶,长沙一株洲段常年可航15一300吨船舶。其支流中下游均可通航10~20吨船舶。湘江上建有两座公路大桥。民航通北京、上海、广州、成都、武汉、西安等城市。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条