说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 汽车设计开发外包项目
1)  Auto design and development outsourcing
汽车设计开发外包项目
2)  project development and designing
项目开发与设计
3)  development project
开发建设项目
1.
It introduces the application of remote sensing technique to the working process and key steps of soil and water conservation monitoring of development projects by taking Hongjiadu Hydro-Power Station as an example.
以洪家渡水电站为例介绍了遥感技术在开发建设项目水土保持监测中应用的工作流程和关键步骤。
2.
Adopting the law of measure coefficient,soil and water loss amounts of plasticity geography during development project is calculated,the veracity of prediction of soil and water loss in the stage is increased greatly,the theoretic basis is offered for the working-out of soil and water conservation scheme of the construction project.
采用实测系数法,推算出开发建设项目施工期各类再塑地貌产生的水土流失量,大大提高了该阶段水土流失预测的准确性,为开发建设项目水土保持方案防治措施的制订,提供了可靠的理论依据。
4)  development and construction projects
开发建设项目
1.
Advances on soil loss monitoring techniques for development and construction projects in China;
我国开发建设项目水土流失监测技术进展
2.
Arrangement of soil and water conservation monitoring points of development and construction projects
开发建设项目水土保持监测点布局
3.
Usually the surface would be hardened in a large area after completion of development and construction projects.
开发建设项目建成后往往使地表大面积硬化,从而改变项目区入渗、蒸发、地表径流量和特性。
5)  development and construction project
开发建设项目
1.
Analysis of soil conservation monitoring method for Xinjiang development and construction projects
新疆开发建设项目水土保持监测方法浅析——以库玛拉克河吐木秀克水电站工程为例
2.
0×105 t/a bamboo-pulp paper production project in Chishui City, Guizhou Province, China for an example, soil and water conservation and ecological reconstruction of the development and construction project in the low mountain and hill region are discussed.
以位于贵州省赤水市的"黔北20万吨/年竹浆林纸一体化工程项目"为例,研究了低山丘陵区开发建设项目中的水土保持和生态建设问题。
3.
This paper discusses the demands for tasks and data of soil and water conservation monitoring in development and construction projects, puts forward an indicator system for soil and water loss monitoring, and designs an information system based on 3S techniques (remote sensing, geographic information system, and global positioning system).
在全面分析开发建设项目水土保持监测的业务和数据需求的基础上,提出了统一的监测指标体系,构建了基于3S技术的开发建设项目水土保持监测信息系统。
6)  construction project
开发建设项目
1.
Problems and suggestions about the botanic measure design of construction project;
开发建设项目水土保持植物措施设计的问题与建议
2.
The proposed construction project should not be approved or needed to revise if it not complies with the standards.
2008年7月1日起《开发建设项目水土流失防治标准》《开发建设项目水土保持技术规范》两部国家标准的正式实施,我国开发建设项目的选线选址、工程设计、施工组织、施工方式和工艺、工程管理等有了水土保持的限制性规定,不符合国家标准的建设项目将予以否决或修正。
3.
How to predict water erosion in construction projects is important for the control of new erosion.
开发建设项目中水蚀量的预测方法研究对于防治新的水土流失具有十分重要的意义。
补充资料:亚洲开发银行贷款项目


亚洲开发银行贷款项目
project financed by Asian Development Bank

  Yazhou Ka一fay一nhang daikuan xiangmu亚洲开发银行贷款项目(projeet finaneed byAsian块veloPment Bank)亚洲国家接受亚洲开发银行贷欲或脂款在本国建设的农业、工业、卫生保健、公用事业及羞础设施等项目。 亚洲开发银行,简称亚洲银行或亚行,是个类似世界银行,但只面向亚太地区的区域性政府间金融开发机构,建立于1966年n月,并于同年12月开始营业,总部设在菲律宾首都马尼拉. 银行的任务促进亚太地区发展中成员的经济发展,更好地利用自己的资源和在经济上取长补短,并促进其对外贸易的发展;为成员拟定、执行发展项目和规划提供技术援助;以亚洲开发银行认为适当的方式,同联合国及其所属机构、本地区发展荃金投资的国际公益组织以及其它国际机构、各国公营和私营实体进行合作,并向它们展示投资和援助的机会。 贷毅的条件与类型①贷款条件。亚洲开发银行根据1990年人均国内生产总值的不同,由低到高将发展中成员划分为A、B、C三类。对不同类的国家或地区采用不同的贷款或赌款条件.凡人均国内生产总值为851美元或不足851美元的发展中成员属A类,其中包括阿富汗、孟加拉、不丹、柬埔寨、中华人民共和国、库克群岛、印度、墓里巴斯、老挝、马尔代夫、马绍尔群岛、密克罗尼西亚、蒙古、缅甸、尼泊尔、巴荃斯坦、所罗门群岛、斯里兰卡、汤加、瓦努阿图、越南和西萨摩亚。属于B类的有:印度尼西亚、巴布亚新几内亚、菲律宾和泰国.属于C类的有:斐济、香港、韩国、马来西亚、新加坡和中国台湾。亚洲开发银行发放贷款的重点领域是农业、农产品加工、能源、工业、非嫩料矿业、财务部门、交通、通信、供水、卫生、城市发展、保健和人口等。②贷款类型。按贷欲条件划分.亚洲开发银行的贷款可分为硬贷欲、软贷欲和附欲三类。硬贷款的贷款利率为浮动利率,每半年调整一次。贷狱期限为10~30年(含2~7年的宽限期)。软贷教,即优惠贷款,仅提供给A类成员,贷欲期限为40年(含10年宽限期),不收利息,仅收1%的手续费。属于B类成员有可能获得软贷款,但与普通资金混合使用。至于赠款则用于技术援助,资金由特别基金提供,但赠软金额有限制。 贷毅的形式①项目贷款。为某一成员发展规划的具体项目提供贷款,这些项目需具备经济效益好、有利于借欲成员的经济发展和借款成员有较好的资信等三个条件。与世界银行发放贷款程序极其相似,亚洲开发银行发放项目贷款也要经过项目确定、可行性研究、实地考察和预评估、评估、准备贷欲文件、贷狱谈判、盆事会审核、签署贷款协定、贷款生效、项目执行、提狱、终止贷款账户、项目完成报告和项目的后评价等一系列工作。项目贷款是亚洲开发银行传统的和最主要的贷款形式。②规划贷款。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条