1)  Shaft wall frozen
井筒全深冻结
2)  deep frozen shaft
深冻结井筒
3)  frozen shaft
冻结井筒
1.
C70,C75 high strength concrete were used to construction of deep unconsolidated layers frozen shaft.
在深厚松散层冻结井筒中采用了C70、C75高强高性能混凝土。
4)  freezing shaft
冻结井筒
5)  deep freezing well
深冻结井
1.
Application of information construction for deep freezing well;
信息化施工在深冻结井中的应用
6)  frozen shaft
冻结深井
1.
Durability and micro-mechanism of C70 high performance concrete in frozen shaft
冻结深井用C70高性能混凝土的耐久性能及微观机理研究
2.
The microstructure of high strength concrete (C70) in frozen shaft and ordinary concrete (C40) was studied and compared by XRD,SEM,DSCUTG and MIP.
就冻结深井高强混凝土(C70)与普通混凝土(C40)的微观结构,采用XRD、SEM、DSC和TG、 MIP方法对其进行了分析比较。
3.
In this paper,C100 high strength concrete with different mixture proportions was prepared,which was designed for application in frozen shaft.
就冻结深井C100高强混凝土不同配合比的干缩性能和绝热温升特性进行了对比试验研究。
补充资料:井筒延深
      在多水平开拓的矿井,为保证矿井持续生产,将生产井筒延深到新水平的凿井方法。延深方案应充分利用生产的有利条件,减少与生产提升、运输之间的干扰,加快施工速度,提高经济效益。为保证安全,在生产矿井底部须留矿柱或人工构筑保护盘,将生产井筒与延深井筒隔开。保护盘的强度应能承受提升容器满载时坠落所造成的冲击。
  
  井筒可自上向下或自下向上延深。自上向下延深时:①可掘进延深临时工程,然后在保护盘或安全岩柱保护下,自上而下延深井筒。井筒延深到底后,再安好罐梁,拆除保护盘,或凿通安全岩柱,经校对测量,将上段生产井筒的罐道向下接长,即可交付生产。②也可不掘进临时工程,采用地面提升设施,利用生产井筒内预留的延深间或梯子间。本法由于断面较小,只能通过小吊桶,延深速度受到限制,对生产干扰较大,在中国应用较少。
  
  自下向上延深井筒,从下水平已有的巷道沿井筒轴线方向向上打一小反井,然后再按设计断面扩大成井(见图)。小反井一般用普通法或吊罐法施工,也可用爬罐法、深孔分段爆破法或钻机法等施工(见天井掘进)。
  
  

参考书目
   《井巷工程施工手册》编写组编:《井巷工程施工手册》,第十四分册,煤炭工业出版社,北京,1979。
  

说明:补充资料仅用于学习参考,请勿用于其它任何用途。