说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 抗浮设计水位
1)  anti-uplift water level
抗浮设计水位
1.
Based on the meteorological and hydrographic and groundwater conditions at the area around Hefei,the paper analyzes the hydraulic connection and running rules of groundwater and surface water at the area;and combining with the current hydrographic data,it also makes analysis of anti-uplift water level during the design of basement and underground structure.
文章阐述了合肥地区的气象和水文条件、地下水的埋藏条件,分析区内的地下水和地表水水力联系以及运行规律;根据现有的水文资料,探讨了地下室或地下构筑物的抗浮设计水位的取值。
2)  water level for prevention of up-floating
抗浮设防水位
1.
The ground subsidence and water level for prevention of up-floating of Beijing Shahe Higher Education Park is elaborated.
论述了北京沙河高教园区项目在建设中将遇到的地面沉降及抗浮设防水位的确定问题,并提出了相应的解决措施。
2.
In order to insure the safe of the building,the safe groundwater level height,referred as water level for prevention of up-floating in general,must be confirmed before the design stage.
为保证建筑物不发生上浮事故,设计前必须确定保障建筑物安全的地下水水位高程,该高程一般被称为建筑物抗浮设防水位。
3.
According to Specification for Geotechnical Investigation of Tall Buidings(JGJ 72—2004),the water level for prevention of up-floating should adopt the highest water level determined during investigation construction.
《高层建筑岩土工程勘察规程》(JGJ72—2004)指出,场地抗浮设防水位可采用实测最高水位,但未指出在多层地下水的情况下,可采用基础底板所在层的最高水位作为抗浮设防水位。
3)  protected anti-floating water level
设防抗浮水位
4)  Anti-floating design
抗浮设计
1.
In-depth analysis about various anti-floating design projects commonly used in concrete water pool design was carried out,and measures against various antifloating in its application conditions and the economy,feasibility were proposed.
埋地式水池构筑物的抗浮设计方案的选择,影响到结构设计的合理性和工程造价的经济性。
2.
This paper analyzes the necessity of theoretical research into building anti-floating design,calculates the buoyancy,illustrates anti-floating measures at construction stages and permanent anti-floating measures,and proposes treatment measures for the building after its floating,in order to help technicians select appropriate and effective treatment methods.
分析了建筑抗浮设计理论研究的必要性,对浮力进行了计算,详细地阐述了施工阶段的抗浮措施和永久性的抗浮措施,并提出了建筑上浮后的处理措施,以帮助技术人员采用合适有效的处理方法。
3.
Based on practical projects,the anti-floating design methods of pile foundation and raft of beam are proposed and then the design details,calculation methods and structure formations of prestressed concrete pipe pile are also introduced,effectively solve the problems existed in construction.
结合工程实例,着重介绍了工程中采用的柱下桩基础加梁式抗水板的抗浮设计方法和先张法预应力混凝土管桩用作抗拔桩的设计要点与计算方法,以及抗拔桩与承台的连接构造,有效解决了施工中存在的问题。
5)  anti-uplift water level
抗浮水位
6)  building site water level for prevention of up-floating
场地抗浮设防水位
补充资料:抗浮
1.举瓠。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条