说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 竣工实测沉降
1)  completed settlement
竣工实测沉降
1.
Through the statistical analysis of the completed settlement of the embankment treated by cement-soil mixing pile,this paper calculates the settlement at any time and forecasts the final settlement by using hyperbola method so as to get the late project settlement.
通过统计分析水泥土搅拌桩处理的路堤填筑期竣工实测沉降,采用双曲线法求出任意时刻的沉降量,并预测其最终沉降量进而得到工后沉降,通过对几条高速公路的观测沉降数据的分析得到采用双曲线法计算得到工后沉降偏于保守,提出了修正水泥土搅拌桩处理的高速公路路堤工后沉降的经验关系公式。
2)  completing construction settlement
竣工沉降
3)  Measured settlement
实测沉降
1.
This paper analyzes the stability behavior of large tapered floating-roof steel storage tanks according to measured settlements.
基于实测沉降数据考察变壁厚浮顶型钢储罐的稳定性。
4)  practical settlement value
实测沉降量
1.
In order to find a reasonable means to determine the index of compressibility,a reasonable selection of parameters in the settlement formula is made on the basis of common settlement formula in present practice and the practical settlement value from the soft clay of westem channels of Shenzhen lough filling engieering.
为了寻求一种合理确定压缩性指标的方法,根据目前实际中广泛采用的沉降量计算公式,以深港西部通道填海工程软土的实测沉降量为例,通过对沉降量计算公式中参数的合理选取,反算求得了压缩性指标,经验证,其结果符合实际情况。
5)  finish construction survey
竣工测量
1.
Data Process of Pipe Line Finish Construction Survey;
管线竣工测量的数据处理
2.
This paper discussed the necessity of finish construction survey of underground pipeline.
论述了城市地下管线竣工测量的必要性,同时结合惠州市地下管线竣工测量的现状及其管理状况,提出了地下管线竣工测量的几点建议。
6)  final survey
竣工测量
1.
This paper introduces the necessity and importance of final survey of underground water supply line,expounds the contents of and methods for the surveying,and advances some suggestions.
介绍了城市地下给水管线竣工测量工作的必要性和重要性,阐述了测量的内容及施测方法,提出了一些建议。
补充资料:竣工
工程完成:~验收ㄧ提前~ㄧ即将~ㄧ全部~。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条