说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 钢轨道梁
1)  steel track girder
钢轨道梁
1.
5 m steel track girder for Xiejiawan Overpass of the first phase project of Line 2 of Chongqing light rail because it is the first application of straddled type monorail in China with new technology,big difficulty and high design requirement.
5 m钢轨道梁的设计问题。
2)  steel-concrete composite simple-supported track beam
钢-混简支组合轨道梁
1.
With the background of track beams adopted in Chongqing straddle single-track transit systems, dynamic behavior of steel-concrete composite simple-supported track beam is discussed in this paper.
以重庆跨座式单轨交通系统中采用的轨道梁为研究背景,探讨了钢-混简支组合轨道梁的动力特性。
3)  beam of light rail
轻轨轨道梁
4)  track beam
轨道梁
1.
In this article,authors emphasize the construction and detection method of cement mixing pile composite foundation under track beam basement.
重点介绍轨道梁基础下水泥搅拌桩复合地基的施工及检测方法,特别是轨道梁基础下水泥搅拌桩复合地基荷载大,地质条件复杂,该部分成桩质量至关重要,主要途径通过以现场抽芯进行无侧限抗压试验检测为主,辅以原位测试试验手段进行质量控制。
2.
An introduction is given to erection technology for track beam over busy trunk road, by means of centering and tray rolling rod method for longitudinal and lateral movement.
介绍在繁忙主干道上架设轨道梁时采用纵横向移梁的 方法,利用膺架作为走行轨道,通过轨道电动小车进行纵移,采 用托盘滚杠法进行横移,达到架设的目的。
5)  track cross beam
轨道横梁
1.
The full-scale fatigue test of the connection structural details between track cross beams and monolithic joints in the Chongqing Caiyuanba Yangtze-river Bridge,the first long-span rail-cum-road bridge in China,is introduced.
介绍国内首座大跨度公轨两用桥——重庆菜园坝长江大桥轨道横梁与整体节点连接的足尺模型疲劳试验。
6)  rail bearer
轨道梁
1.
This paper describes several treatment methods for foundation of rail bearer of wharf gantry crane,and puts forward some suggestions for design and construction,so as to shorten the maintenance period of gantry crane rail bearer,and ensure good performance of equipments.
对码头门机轨道梁基础处理的几种方法进行了论述,并对设计、施工提出一些建议,以缩短门机轨道梁的维护周期,保证设备处于良好工作状态。
2.
The construction and detection method of cement mixing pile uner the foundation of rail bearer are emphatically introduced in the paper.
重点介绍轨道梁基础下水泥搅拌桩复合地基的施工及检测方法。
3.
According to the calculation results of 30 kinds of reinforced concrete rail bearer and 70 kinds of pretensioned rail bearer for high pile wharf,the studies on the relation between the height of rail bearer and the space of pile bent,the location of resul.
就高桩码头的30种钢筋混凝土轨道梁和70种先张法预应力混凝土轨道梁的计算结果,对其梁高和排架间距的关系,预应力钢筋合力点的位置、梁的最大挠度等进行了研究,提出了建议和有关计算图表。
补充资料:组合钢模板支设


组合钢模板支设


组合钢模板支设
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条