1)  concrete double-curvature arch dam
混凝土双曲拱坝
1.
For concrete double-curvature arch dam at Baotan Hydropower Station,at tender stage and at constructional organization design stage one LSLGF100 water cooling unit is planned to be used separately to pre cool water used for concrete mixing in hot days from May to October.
宝坛水电站混凝土双曲拱坝工程,在投标阶段及施工组织设计阶段均考虑投入1台LSLGF100型冷水机组,即计划于5~10月份高温时段内对混凝土拌和用水进行预冷处理。
2.
The final scheme is concrete double-curvature arch dam,4 surface holes + 5 deep holes + 2 bottom outlets + plunge pool,and a flood discharge tunnel with pressure flow section connected to free flow section and underground power house on right bank.
最终选定的枢纽布置方案为:混凝土双曲拱坝,坝身4个表孔+5个深孔+2个放空底孔+坝后水垫塘与右岸1条有压接无压泄洪洞及右岸地下厂房。
2)  RCC double-curvature thin arch dam
碾压混凝土双曲薄拱坝
1.
Pre-splitting blasting technology for foundation excavation of high RCC double-curvature thin arch dam;
高碾压混凝土双曲薄拱坝坝基开挖预裂爆破技术
3)  the rolled concrete double-curvature arch dam
碾压混凝土双曲拱坝
1.
The excavation of the rolled concrete double-curvature arch dam and gravity dam in Dahuashui hydroelectric station in Guizhou adopted deep-hole graded slight differences demolition.
贵州大花水水电站碾压混凝土双曲拱坝、重力坝开挖采用深孔梯段微差爆破。
4)  complex double curvature arch RCC dams with more height and less thickness
碾压混凝土双曲高薄拱坝
5)  Concrete arch dam
混凝土拱坝
1.
Risk analysis of construction progress of large concrete arch dam;
大型混凝土拱坝施工进度风险分析
2.
Reliability index calculation of concrete arch dam by a combined stochastic FEM and maximum entropy method;
随机有限元与最大熵法联合求混凝土拱坝可靠度
3.
Linear cracking stochastic analysis and nonlinear intension analysis of concrete arch dams;
混凝土拱坝线性开裂随机分析与非线性强度分析
6)  concrete of arch dam
拱坝混凝土
1.
Concentrated on the questions of temperature control and crack prevention studies on concrete of arch dams, simulative calculation theories of temperature and stress fields of concrete of arch dams are systematically studied in theory and practice, the temperature control of Huaguangtan arch dam is analyzed and studied in detail.
本文围绕拱坝混凝土的温控防裂问题,从理论和实践上系统地研究了拱坝混凝土温度场和应力场的仿真计算理论,并对在建工程华光潭拱坝混凝土的温控问题进行了详细的分析和研究。