说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 发电容量适应性
1)  generation capacity adaptability
发电容量适应性
1.
The generation capacity adaptability index is introduced to improve network power transfer capability and enhance its operation ability to withstand generation capacity variations.
文中引入发电容量适应性指标,衡量网络结构对发电出力容量变化的适应能力,建立考虑网络结构优化的多目标输电网规划模型,对多场景电网期望负载水平进行优化,改善电网运行环境和应对发电出力容量变化的能力,提高电网功率传输能力,减少各场景下的负荷损失。
2)  generation capacity adequacy
发电容量充裕性
1.
For generation capacity adequacy(GCA)control purpose,implementing time-of-use power price can be regarded as preventive control and reserve capacity on generation side,interruptible load with low price,interruptible load with high reparations can be considered as emergency/corrective controls.
在发电容量充裕性的研究中,需求侧管理及需求侧备用市场通常是与发电侧备用市场孤立的。
2.
Since it is well acknowledged that the energy-only market could not ensure the generation capacity adequacy,a lot of research work has been done around the world to explore new ways to solve this important and yet difficult problem.
鉴于单一能量市场模式难以确保发电容量充裕性,国际上已提出多种旨在解决该问题的方法。
3.
It is a widely-discussed important issue to determine whether generation capacity adequacy could be ensured by the energy-only market approach.
能否完全依靠单一能量市场来确保发电容量充裕性是一个存在广泛争论的重要问题。
3)  generation capacity
发电容量
1.
Optimization design of generation capacity adequacy based on integrated resource planning;
综合资源规划下发电容量充裕度的优化设计方法
2.
The adequacy analysis system of generation capacity in electricity market could be used to analyze the level of the generation capacity adequacy in electricity market, and provide the support to power system operation and investment.
电力市场发电容量充裕度分析系统可以用来分析电力市场环境下的发电容量充裕度水平, 为系统的运行和电力的投资提供支持。
3.
A dynamic simulation model was built to solve the setting of two key parameters,the energy price cap and the capacity price,in the generation market,and was then used to analyze the generation capacity development in various scenarios.
针对发电竞争市场中的两项关键参数——能量价格上限和容量价格的设置问题,研究提出了发电容量动态仿真模型,运用该模型对不同情形下的发电容量增长趋势进行了模拟仿真。
4)  development adaptability
发展适应性
1.
The trunk line network development adaptability evaluation on low density urban area;
低密度城市化地区干线公路网发展适应性评价
5)  adaptability development
适应性开发
1.
The adaptability development of the software means that the original functions of the software are preserved and the new helpful functions are added to it so as to enable the software to have more adaptability and flexibility.
适应性开发是指保留软件的原有功能,改造或增添一些新功能,以增强软件适应性和灵活性的技术。
6)  launching flexibility
发射适应性
补充资料:发电机组有效载荷容量


发电机组有效载荷容量
effective load carrying capability of generat-ing unit

fod一anj一Zu youxlao zal触rong}‘Ong发电机组有效狡荷容t(effeetive IOad。arry-ing eapability of generating unit)发电机组板定容量减去为保持系统风险度不变所需预留的备用容量后的值.用公式表示为 C~C一△天(1)式中G为发电机组有效载荷容t;C为发电机组额定容量;△尺为系统所需备用容量。就是当系统扩建一台新机组后,该机组所能承担的系统负荷须小于机组的额定容量,才能使系统相对备用容t不变,从而使系统风险度保持不变。 计算方法由容量模型的递推公式(见发电系统模型)可知,当系统中增加一台额定容t为C,强迫停运率为q的发电机组时,系统停运容t等于和大于X的累积概率变为 P(X)二P‘(X)(1一叮)+P‘(X一C)叮(2)式中尸,(X)是未追加机组时的泉积概率,尸(X)是追加以后的新值。由式(2)可知尸(X)>Pl(X).因此,在增加一台机组后当停运容t均为X时,系统的风险度增大了.为使系统风险度仍保持为尸‘(X)的值,必须增加系统的备用容量。设此备用容t由新机组容量C中扣出其值为△尺,则由式(2)可写出下面的关系式 尸(X+△尺)一尸,(X+△尺)(1一q)+尸‘ (X+△尺一C)叮二P‘(X)只考虑上式右端等式,并略去尸上的符号“‘”即得 P(X+△尺)(l一口)+P(X+△尺一C),=P(X)(3)要求得△尺的值,必须知道系统容t模型中尸(X)的解析表达式,但这是有困难的。为此,可利用指数曲线来局部地拟合尸(X)与X的函数关系(见发电系统风险特性系数),有 尸(x)一刀e一丢(4)式中m为系统风险特性系数;B为常数.将式(4)的关系应用于式(3)后,在等式两端取对数,经过简单运算可得 战=。In〔(1一。)+。e景〕 一mln[(1一。)+。e景](5) 将式(5)代人式(1),最后求得此新发电机组的有效载荷容t为 c’=c一从一e一m一n〔(l一。)+。e轰](6)由此可知,C.不仅与机组本身的强迫停运率q(见电力系统可幸性基本数据)有关,且与系统风险特性系统数m有关。不难证明,q越小或二越大,C。越接近C。 应用在长期电源发展规划中,应用机组有效载荷容量代替额定容量,可在保持系统风险度不变的判据下,确定合理的装机类型和进度,以适应系统负荷的增长。此外,应用等风险度法安排发电系统机组检修计划时,将机组有效载荷容量与负荷模型结合,可以求得优化的结果(见发电系统检修计划优化)。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条