说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 山西省万家寨引黄工程
1)  Wanjiazhai Yellow River Diversion Project in Shanxi Province
山西省万家寨引黄工程
2)  ShanXi WanJiaZhai y ellow River Division project General Main Works
山西万家寨引黄工程总干线
3)  Wanjiazhai YRDP
万家寨引黄工程
1.
Summarization on the Characteristics of Water Supply Pumps in Wanjiazhai YRDP (Yellow River Diversion Project);
山西万家寨引黄工程供水泵组特点综述
2.
Comparison and Selection of the Construction Schemes for the Outlet Section of No.1 Tunnel in the Northern Main Line of Wanjiazhai YRDP(Yellow River Diversion Project);
万家寨引黄工程北干线1号隧洞出口段施工方案比选
3.
The Application of GIS (Geographic Information System) in the Construction and Management of Wanjiazhai YRDP (Yellow River Diversion Project);
地理信息系统在万家寨引黄工程建设和管理中的应用
4)  Wanjiazhai Yellow River Diversion Project
万家寨引黄工程
1.
Analysis and prediction on water quality and its trend within areas supplied by Wanjiazhai Yellow River Diversion Project;
万家寨引黄工程供水区水质分析及趋势预测
2.
Excavation Construction of Underground Pump Station No.1 and No.2 in Wanjiazhai Yellow River Diversion Project;
万家寨引黄工程总干线一、二级地下泵站开挖施工
3.
Population patterns of dominants of plant communities alongside Wanjiazhai Yellow River Diversion Project,Shanxi;
万家寨引黄工程沿线植物群落优势种群分布格局研究
5)  YRDP
万家寨引黄工程
1.
On the basis of analyzing the current situation of groundwater development and utilization in Taiyuan water supply area of Wanjiazhai YRDP(Yellow River Diversio Project), a series of environmental hydrogeologic problems caused by over-exploitation of the groundwater are revealed.
在分析万家寨引黄工程太原供水区地下水开发利用现状的基础上,指出地下水超采引起的环境水文地质问题有:泉水断流;区域地下水水位下降并形成大面积降落漏斗,含水层疏干或产水量减少;由于地下水水位下降,导致地下水水质污染加重及地面沉降。
2.
1in the South Main Line of YRDP and the structure de-sign of its inlet pressure pipes.
介绍了万家寨引黄工程南干线一级泵站工程地质情况和其进水压力管道的结构设计。
6)  PhaseⅠof Wanjiazhai Yellow River Diversion Project
万家寨引黄一期工程
补充资料:山西
1.山的西坡。 2.战国﹑秦﹑汉时称崤山﹑华山以西地区。又称关西。 3.称太行山以西黄河以东地区。隋末置山西河东黜陟讨捕大使,元置河东山西道宣慰使司,明置山西行中书省,清至今皆为山西省。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条