说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 沁河倒虹吸
1)  Qinhe River inverted siphon
沁河倒虹吸
2)  Cihe invert siphon project
磁河倒虹吸
1.
The key point of concrete construction in Cihe invert siphon project are the vertical transportation of pipeline concrete placement and the construc tion of moid plate procesa Through comparing with similar engineering and analyzing the real situation, the vertical transportation and mold plate construc- tion are determined after systematic verificatioa.
磁河倒虹吸工程混凝土施工的关键点在于管身段混凝土浇筑的垂直运输及模板工艺的施工。
3)  the inverted siphon of the Tanghe River
唐河倒虹吸
4)  the Hutuo River's Inverted Siphon Project
滹沱河倒虹吸
5)  Tanghe Inverted Siphon
唐河倒虹吸工程
1.
Construction techniques for Tanghe Inverted Siphon on Mid-route of South-to-North Water Transfer Project;
南水北调中线唐河倒虹吸工程施工技术
6)  Inverted Siphon across Yongdinghe River
永定河倒虹吸
1.
Study on movable-bed model test and protection measures for Inverted Siphon across Yongdinghe River
永定河倒虹吸动床模型试验及防护措施研究
补充资料:沁河
沁河

    中国黄河下游支流。源出晋东南沁源县北太岳山东麓。南流切太行山地,经安泽县,穿阳城盆地,继续南行,进入河南省纳丹河  ,在武陟县詹店附近注入黄河。全长456千米。河流上游穿行在山地和台地间,曲折蜿蜒,造成深切的河曲。进入太行山地后,流水湍急,形成峡谷,蕴藏着丰富的水力资源。出山口后在五龙口处形成冲积扇,早在2000多年前就被开辟为农田灌区,现在这里建立了完整的水利工程,是太行山南麓的主要农业生产基地。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条