说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 防洪工程图
1)  flood control engineering map
防洪工程图
2)  flood control project
防洪工程
1.
Influence of Yangtze flood control projects on rare aquatic animals and fishes;
长江防洪工程对珍稀水生动物和鱼类的影响
2.
Progress of calculation methods for economic benefits of flood control projects;
防洪工程经济效益计算方法研究进展
3.
Application of reinforced earth retaining wall in Huaihe river flood control project;
淮河防洪工程中加筋土挡土墙的应用
3)  flood control engineering
防洪工程
1.
Also author puts forward the some important dimetions of new maerials for flood control engineering.
本文分析了防洪工程建设与治理对材料的基本要求与特点。
2.
This paper introduced that flood control engineering,and situation,as well as flood historical in Qiqihar,which is an important city in the west of Heilongjiang,and finally put forwerd the flood control tactics for the city.
介绍黑龙江省西部重镇齐齐哈尔市的防洪工程、汛情和历史洪水简况 ,提出城市防洪对策。
3.
Watershed flood control engineering system is a complex system consisted of random,fuzzy,unascertainable uncertainties,which has taken up the main part of the flood disaster management.
防洪工程体系是由随机、模糊、未确知等众多不确定性因子组成的复杂系统,它至今仍是洪水灾害管理的主体,对该体系综合安全进行定量评价可为洪水灾害管理提供重要依据。
4)  flood control works
防洪工程
1.
Analysis of environmental effect and protecting plans of Fen River downstream flood control works;
汾河下游防洪工程环境影响及保护方案分析
2.
Effect of flood control works on value of real estate along the rivers and its quantitative model studies;
防洪工程对沿江(河)房地产价值的影响及其量化模型研究
3.
Muddy soil construction technology considerations for the lower Mulan Creek flood control works;
木兰溪下游防洪工程淤泥施工技术研究
5)  flood prevention project
防洪工程
1.
The passage lists part of existing flood prevention projects of Liaohe River Valley in Liaoning Province,including reservoirs,flood gates,and embankments.
辽河流域洪水灾害严重,针对水利工程影响因素众多的特点,对辽宁省内辽河流域现有的部分防洪工程,包括水库、水闸和堤防,采用"影响辐射"理念建立指标体系,应用AHP法对工程布局影响效果进行分析,得出相应结论。
2.
Aimed at existing issues in current flood prevention projects and combining with consideration of characteristics of flood prevention project construction in each reach of the river, it should be made during the "Tenth Five Year Plan" period to perfect flood prevention project.
针对现状防洪工程存在的问题 ,结合各河段的防洪工程建设特点 ,“十五”期间应逐步完善防洪工程体系 ,提高工程防御洪水能力 ,满足区域经济发展对防洪的要求。
3.
Because there are long distance of range, many sites and scattered locations of the Yellow River flood prevention projects, survey of project sections will cost much time and energy if the traditional ways are applied.
黄河防洪工程线路长、点多、段落分散 ,采用传统方法测绘工程断面费时耗力。
6)  Flood-control project
防洪工程
1.
Study on the landscape model of flood-control projects in medium and small-sized cities in the middle or lower reaches of Yangtze River;
长江沿江中小城市防洪工程景观模式的研究
补充资料:防洪工程
      为控制、防御洪水以减免洪灾损失所修建的工程。主要有堤、河道整治工程、分洪工程和水库等。按功能和兴建目的可分为挡、泄(排)和蓄(滞)几类。
  
  挡  主要是运用工程措施"挡"住洪水对保护对象的侵袭。如用河堤、湖堤防御河、湖的洪水泛滥;用海堤和挡潮闸防御海潮;用围堤保护低洼地区不受洪水侵袭等。利用具有挡水功能的防洪工程,是最古老和最常用的措施。用挡的办法防御洪水,将改变洪水自然宣泄和调蓄的条件,一般将抬高天然洪水位。有些河、湖洪水位变幅较大,且由于泥沙淤积等自然演变和人类开发利用洪泛区等活动的影响,洪水位还有不断增高的趋势;一般堤线都较长、筑堤材料和地基选择余地较小、结构不能太复杂,堤身不宜太高。因此,用挡的办法防御洪水在技术经济上受到一定限制。
  
  泄  主要是增加泄洪能力。常用的措施有修筑河堤、整治河道(如扩大河槽、裁弯取直)、开辟分洪道等,是平原地区河道较为广泛采用的措施。①扩大河槽、河道裁弯取直都能降低洪水位,增大本河段的泄洪能力;河道裁弯取直还可以缩短航程,有的还能缓解弯顶淘刷和崩岸对堤防的威胁。但这些措施将增加其下游河段的洪水流量、加大防洪负担。②修筑河堤也有增大河道泄量的功能,将原来漫溢出去的洪水控制在堤防限制的河槽内。这一方面减少了河段的调蓄容量,另一方面抬高了洪水位,增大了水深,从而加大河道的流速和下泄流量。加高原有堤也能增大泄洪能力,但不适当的加高堤防,将增加堤防本身的风险度,增加下游防洪负担。③开辟分洪道,分洪入其他河流、湖泊、洼地、海洋都能降低其下游河段的水位、洪水流量,减轻防洪负担。如分洪道绕过狭窄河段后又回归原河道,可降低狭窄河段的水位、洪水流量,减轻防洪负担,但这些措施都可能改变沿途或承泄区的环境,规划时要综合考虑,以免带来新的问题。
  
  蓄(滞)  主要作用是拦蓄(滞)调节洪水,削减洪峰,减轻下游防洪负担。如利用水库、分洪区(含改造利用湖、洼、淀等)工程等。水库除可起防洪作用外,还能蓄水调节径流,利用水资源,发挥综合效益,成为近代河流开发中普遍采取的措施。但修水库投资大,还要淹没大量土地,迁移人口,有些地方还淹没矿藏,带来损失。开辟分洪区,分蓄(滞)河道超额洪水,一般都是利用人口较少的地区,也是很多河流防洪系统中的重要组成部分。在山区实施水土保持措施,可起蓄水保土作用,遇一般暴雨,对拦减当地的洪水有一定效果。
  
  一条河流或一个地区的防洪任务,通常由多种措施相结合构成的工程系统来承担。工程的布局是根据自然地理条件,洪水、泥沙特性,社会经济,洪灾情况,本着除害与兴利相结合,局部与整体统筹兼顾,蓄泄兼筹,综合治理等原则,统一规划。一般是在上中游干支流山谷区修建水库拦蓄洪水,调节径流;山丘地区广泛开展水土保持,蓄水保土,发展农林牧业,改善生态环境;在中下游平原地区,修筑堤防,整治河道,治理河口,并因地制宜修建分蓄(滞)洪工程,以达到减免洪灾的目的。
  

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条