说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 运行风险评价
1)  Operational risk evaluation
运行风险评价
2)  Shipping risk appraisal
航运风险评价
3)  operation risk assessment
运行风险评估
1.
Power system operation risk assessment can evaluate the likelihood and severity of contingencies, but it is time-consunming to analyze all possible contingencies in real-time environment.
电网运行风险评估可以综合考虑扰动事件发生的可能性和严重性,其模型复杂、计算量大。
2.
Absence of statistical components\' failure data is a great challenge for power system operation risk assessment.
缺乏历史故障统计数据是电力系统运行风险评估中的突出难题。
3.
A time-varying and condition-based component outage model is needed for operation risk assessment,which should consider the change of weather,aging degree and other operation conditions.
电力系统设备发生故障的可能性是随外部天气条件、老化程度等运行工况变化而变的,因此在运行风险评估中需要采用时变的设备停运模型。
4)  risk evaluation
风险评价
1.
Research on risk evaluation of safety management organization of mine enterprise and its application;
矿山企业安全管理组织风险评价方法及应用
2.
GIS-based risk evaluation of karst land degradation disaster:a case of Du'an Yao Autonomous County;
基于GIS的喀斯特土地退化灾害风险评价——以广西都安瑶族自治县为例
3.
Application of risk evaluation in coalmine gas hazard based on model of SPA;
基于SPA模型的煤矿瓦斯危险源风险评价
5)  risk assessment
风险评价
1.
The viruses distribution and survival in aquatic environments and risk assessment of viral contamination;
水环境中病毒的分布存活及其健康风险评价
2.
Progress of risk assessment and optical routing for hazardous materials transportation by road;
危险品道路运输风险评价与优化选线的研究进展
3.
Feces pollution of livestock and poultry and its environmental risk assessment in Jiangsu;
江苏省畜禽粪便污染现状及其风险评价
6)  risk analysis
风险评价
1.
This article puts forward the partial least squares(PLS) regression and the maximum entropy(ME) risk analysis model for the first time on the basis of analyzing the disadvantage of the traditional methods and anatomizing the advantage of the partial least squares regression method and the maximum entropy method.
作者在分析传统风险评价方法的优缺点、剖析偏最小二乘法和最大熵法优势的基础上,首次提出了偏最小二乘-最大熵(PLSME)风险分析模型。
2.
Fuzziness and randomness exist extensively in uncertain phenomena during the risk analysis.
风险分析中的不确定现象存在大量的模糊性和随机性 ,利用模糊学期望将模糊性与随机性相结合 ,给出了模糊随机风险的定义 ,进而提出了一种风险评价的新方法。
3.
The quantitative risk evaluation method suitable for Nanyue alien harmful plants was established with referring to the pest risk analysis method by international and national experts,based on the character of those plants in Nanyue.
参照国内外专家对有害生物风险分析的方法,结合南岳外来有害植物的特点,初步探讨适应于南岳外来有害植物风险评价的定量分析方法,并采用该方法分析红花酢浆草在南岳的入侵风险,结果表明,红花酢浆草的风险值R为1。
补充资料:运行
1.周而复始地运转。 2.犹活动。 3.世运;命运。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条