您的位置:首页 -> 词典 -> 异型双壁钢围堰
1)  special shaped duble wall steel cofferdam
异型双壁钢围堰
2)  double-wall steel cofferdam
双壁钢围堰
1.
Because it is relatively difficult to construct double-wall steel cofferdam under water and the control process is complex,whether the steel cofferdam is adopted or not resting with engineering geology situation and technology condition.
由于水中墩双壁钢围堰施工难度相对较大,施工过程的控制比较麻烦,因而应根据工程地质状况及技术条件决定采用与否。
2.
This paper presents the design and checking computation method of large-scale double-wall steel cofferdam,which may serve as a reference for design of deepwater foundationed steel cofferdam of similar bridges.
双壁钢围堰是桥梁深水基础施工的重要设施。
3.
This paper summarizes some of the new construction methods and construction technology for double-wall steel cofferdams applied to the construction of in-water foundations of mountainous bridges and also introduces the applicable range,control points and existing problems of several of the technology.
针对山区桥梁基础施工采用双壁钢围堰的一些新的施工方法和施工工艺进行概括总结,介绍几种施工工艺的适用范围、控制要点及存在的问题。
3)  double wall steel cofferdam
双壁钢围堰
1.
This paper presents the design and construction of double wall steel cofferdam for main pier 24 and 25 of the Fourth Bridge on Xiangjiang in Xiangtan.
本文着重介绍湖南湘潭市湘江四桥24号、25号主墩双壁钢围堰的设计及施工方法,根据本工程特点及施工条件,钢围堰采用哑铃形设计方案和无导向船下沉定位施工技术具有参考价值。
2.
,the paper presents an introduction to the arrangement of positioning barges under various conditions of water and tidal flows,the hydraulic calculations for the anchorage systems,and the technology for fabrication,assembling,and lowering down to foundation bed of the double wall steel cofferdam.
双壁钢围堰是大中型桥梁深水主墩施工的大型临时设施。
3.
This paper introduces the water stopping technology for a new type of double wall steel cofferdams with vertical splitting,which was successfully used for the construction of No.
叙述了哈尔滨至大连客运专线第二松花江特大桥主跨1083号、1084号水中墩采用的新型竖向分条双壁钢围堰施工的止水工艺,总结了新型钢围堰的止水施工技术。
4)  double-walled steel cofferdam
双壁钢围堰
1.
Construction technology of double-walled steel cofferdam in the project of Beijiang Bridge
北江特大桥双壁钢围堰施工技术
2.
Taking the bored pile foundation constructed with double-walled steel cofferdam for No.
以湘黔铁路复线渠江大桥2号墩双壁钢围堰钻孔桩基础为工程背景,应用铁路桥涵地基和基础设计规范和建筑桩基技术规范,计算桩的轴向受拉承载力以及群桩基础呈整体破坏和非整体破坏时基桩的抗拔承载力,依据桩的抗拔承载力大小,解析一起双壁钢围堰钻孔桩基础上浮的事故原因。
5)  double-wall steel boxed cofferdam
双壁钢吊箱围堰
1.
This paper presents the study of construction scheme for large-scale deepwater foundation, including the alternative of locate mode for double-wall steel boxed cofferdam, design and arrangement of heavy anchorage system.
介绍大型深水基础施工方案的研究,包括双壁钢吊箱围堰定位方案的比选、重型锚碇系统的设计和布置等。
6)  double-wall cofferdam
双壁围堰
补充资料:45钢和40Cr钢调质的热处理工艺
45钢40Cr钢调质                         
    调质是淬火加高温回火的双重热处理,其目的是使工件具有良好的综合机械性能。
    调质钢有碳素调质钢和合金调质钢二大类,不管是碳钢还是合金钢,其含碳量控制比较严格。如果含碳量过高,调质后工件的强度虽高,但韧性不够,如含碳量过低,韧性提高而强度不足。为使调质件得到好的综合性能,一般含碳量控制在0.30~0.50%。

    调质淬火时,要求工件整个截面淬透,使工件得到以细针状淬火马氏体为主的显微组织。通过高温回火,得到以均匀回火索氏体为主的显微组织。小型工厂不可能每炉搞金相分析,一般只作硬度测试,这就是说,淬火后的硬度必须达到该材料的淬火硬度,回火后硬度按图要求来检查。 

工件调质处理的操作,必须严格按工艺文件执行,我们只是对操作过程中如何实施工艺提些看法。


   1、 45钢的调质
   45钢是中碳结构钢,冷热加工性能都不错,机械性能较好,且价格低、来源广,所以应用广泛。它的最大弱点是淬透性低,截面尺寸大和要求比较高的工件不宜采用。


   45钢淬火温度在A3+(30~50) ℃,在实际操作中,一般是取上限的。偏高的淬火温度可以使工件加热速度加快,表面氧化减少,且能提高工效。为使工件的奥氏体均匀化,就需要足够的保温时间。如果实际装炉量大,就需适当延长保温时间。不然,可能会出现因加热不均匀造成硬度不足的现象。但保温时间过长,也会也出现晶粒粗大,氧化脱碳严重的弊病,影响淬火质量。我们认为,如装炉量大于工艺文件的规定,加热保温时间需延长1/5。


   因为45钢淬透性低,故应采用冷却速度大的10%盐水溶液。工件入水后,应该淬透,但不是冷透,如果工件在盐水中冷透,就有可能使工件开裂,这是因为当工件冷却到180℃左右时,奥氏体迅速转变为马氏体造成过大的组织应力所致。因此,当淬火工件快冷到该温度区域,就应采取缓冷的方法。由于出水温度难以掌握,须凭经验操作,当水中的工件抖动停止,即可出水空冷(如能油冷更好)。另外,工件入水宜动不宜静,应按照工件的几何形状,作规则运动。静止的冷却介质加上静止的工件,导致硬度不均匀,应力不均匀而使工件变形大,甚至开裂。


说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条