2) dewatering run
降水运行
3) reduced voltage operation
降压运行
1.
This paper introduces a method of using 35kV and under reduced voltage operation on 110kV and above transmission line under severely icing and non-interphase grounding condition.
在覆冰严重且存在非相间接地的110 kV及以上输电线采用降压35 kV及以下运行,解决110 kV叙古线在凝冰灾害中尽快恢复古蔺县城供电,提出110 kV叙古线降压运行较抢修线路恢复供电更具可行性。
6) operating speed
运行车速
1.
Virtual simulation test of perception factors for operating speed;
运行车速认知因子虚拟仿真试验
2.
Application of operating speed in the design of highway route;
运行车速在公路路线设计中的应用
3.
The application of artificial neural network in operating speed forecast;
人工神经网络在运行车速预测中的应用
补充资料:冰雹(见降水)
冰雹(见降水)
hail
bingbQo冰雹(hail)见降水。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条