1)  displacement observation of foundation pit
基坑位移观测
2)  pit displacement monitoring
基坑位移监测
1.
Due to the variousness and the complexity of the geological conditions and the observation environments of a pit,it is unavoidable for model errors to exist in the data processing model of pit displacement monitoring.
由于基坑地质及观测环境的多样性和复杂性,基坑位移监测数据处理的理论模型与实际模型之间存在着模型误差。
3)  foundation pitmonitoring
基坑观测
4)  monitoring of foundation horizontal displacement
基坑水平位移监测
5)  displacement observation
位移观测
1.
The slope engineering of Dagushan Open Pit Mine, a deep sunken open pit mine, is investigated by analysis of slope stability with limit equilibrium theory and data collection with geological and hydrogeological survey, blasting vibration measurement, displacement observation, rock mechanics test.
通过工程地质、水文地质调查 ,爆破测振 ,位移观测和岩石力学试验 ,采用极限平衡理论分析边坡稳定性 ,研究大孤山铁矿深凹露天矿的边坡工程。
2.
Settlement and displacement observation influences engineering s safe and schedule directly,which is also a main part for soft ground treatment.
沉降及位移观测是软基处理的一个重要部分,直接影响着工程的安全与进度。
3.
Settlement and displacement observation of foundation pit show top-down construction is practicable,which can meet the requirements on quality control.
结合具体工程实例,根据工程逆作法施工工序,介绍了地下连续墙、中间支承柱、地下室土方的施工方法,探讨了节点处理措施,经过基坑周边沉降及位移观测,该逆作法的施工效果符合质量控制要求。
6)  pit horizontal displacement
基坑水平位移
1.
This paper based on the first phase project JC2 and JC3 segment on Xiamen airdrome road,the technology program of pit horizontal displacement monitoring surveyed by total station is introduced,some problems must be taken care and technical measures in horizontal displacement monitoring of pit are descriped,the horizontal displacement monitoring results analysis of pit are given.
以厦门机场路一期工程JC2和JC3标段为实例,介绍采用全站仪进行基坑水平位移监测的技术方案,论述了基坑水平位移监测中需要注意的问题及采取的技术措施,分析了基坑水平位移监测结果,得到了可靠的监测数据。