1)  filling parameter
填筑施工参数
2)  filling construction
填筑施工
1.
The paper introduces the application of GPS in supervision,communication,positioning of filling construction of concrete face rockfill dam,some problems that should think in composition of supervision center and foundation of the system, as well as related soft wares.
介绍了全球定位系统在混凝土面板堆石坝填筑施工中监控、通讯、定位过程中的应用,以及监控中心的组成和建立系统时应考虑的问题,最后介绍了监控系统软件和数据通讯系统软件。
2.
According to the quality control needs of filling construction of the face rockfill dam, by means of the global satellite positioning technology, the wireless data communication technology, the computer technology and the data processing and analysis technology, and integrating with the roller compaction machine, the GPS real-time supervisory system is developed in this paper.
针对面板堆石坝填筑施工的质量控制需要,利用全球卫星定位技术、无线数据通讯技术、计算机技术和数据处理与分析技术,结合碾压机械进行集成,研制了一套GPS实时监控系统,可用于填筑工程碾压施工质量的实时监控。
3)  fill-construction of dam body
坝体填筑施工
4)  first phase rockfill
一期填筑施工
5)  construction backfilled soil in layer
施工分层填筑
6)  rockfilling construction of rockfill dam
堆石坝填筑施工
补充资料:施工企业技术组织措施计划(见施工企业技术)


施工企业技术组织措施计划(见施工企业技术)
technical and organize measurement plan in construction enterprise

施工企业技术组织措施杯茹”岑,~‘_:_,organize measurement plan in eonstruetionenterPrise)见施工企业技米管理基本制度。