说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 60m预制箱梁
1)  60 m precast box girder
60m预制箱梁
2)  60m long box beam
60m箱梁
1.
Based the characteristics of Jintang Bridge,this paper presents the construction methods,construction tech- niques,key equipment used and its properties for the installation of 60m long box beams in Jintang Bridge.
本文结合金塘大桥的特点,介绍了金塘大桥60m箱梁安装的施工方法、施工技术以及采用的关键设备及其性能,以期为国内同类桥梁的施工和同类大型设备的使用提供经验。
3)  precast box girder
预制箱梁
1.
Analysis of high performance concrete construction technical scheme of precast box girders on passenger dedicated lines;
客运专线预制箱梁高性能混凝土施工技术方案解析
2.
On the basis of the construction of precast box girder in urban-urban railway from Beijing to Tianjin, were discussed , which the construction technology and construction plan of the formwork engineering, steel engineering and concrete engineering etc.
结合京津城际轨道交通线预制箱梁施工,探讨了客运专线条件下箱梁的施工过程中的模板工程、钢筋工程、混凝土工程等的施工方案和施工工艺,并对箱梁的检查验收和施工注意事项做了论述。
3.
In Beijing-Tianjin inter-municipal Railway engineering double-track precast box girders are constructed by high performance concrete to satisfy the long-time use of structure as one hundred years.
京津城际轨道交通工程双线预制箱梁要求采用高性能混凝土进行施工,以满足结构使用寿命100年的目标。
4)  precast box beam
预制箱梁
1.
Application of the polycarboxylic high range water reducer on railway precast box beam
聚羧酸系高效减水剂在铁路预制箱梁中的应用
2.
in the construction of precast box beam for reference.
介绍了预制箱梁施工中如何控制质量,防止木芯模上浮,控制张拉、压浆等关键工序等,理论联系实际,有一定实用价值。
3.
The slip method for transporting the precast box beams of Donghai Bridge is adopted in Shanghai municipal deep water harbour engineering.
上海市深水港工程东海大桥 ,上部结构预制箱梁在预制场内采用滑移方式运输。
5)  prefabricated box girder
预制箱梁
1.
70m prefabricated box girder erection for Donghai Bridge;
东海大桥70m预制箱梁架设施工
2.
The paper mainly introduces the elongation calculation method about the prestressed steel strand of prefabricated box girder and the measurement, and discusses the problems that exist in the elongation indicator computation method about steel strand of prefabricated box girder by comparing with the construction of segment in NingHang expressway.
本文主要介绍预制箱梁的预应力钢绞线伸长量的计算方法及张拉伸长量的量测方法,对照宁杭高速公路宜兴一标段预制箱梁的钢绞线伸长量计算方法及张拉量测中出现的问题进行探讨。
6)  prefabricated box beam
预制箱梁
1.
The application of rubber extract pipe on prefabricated box beam in high-speed railway;
橡胶抽拔管在高速铁路预制箱梁中的应用
2.
The adjusting technology of long span prefabricated box beam over small radius curved bridge
小半径曲线桥梁上大跨径预制箱梁的安装技术
3.
The construction of the prefabricated box beam is more difficult than that of the T-shaped beam.
预制箱梁的施工较T型梁难度大。
补充资料:[3-(aminosulfonyl)-4-chloro-N-(2.3-dihydro-2-methyl-1H-indol-1-yl)benzamide]
分子式:C16H16ClN3O3S
分子量:365.5
CAS号:26807-65-8

性质:暂无

制备方法:暂无

用途:用于轻、中度原发性高血压。

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条