1.
Numerical Well-test Evaluation of Test Information of Swabbing Wells of Composite System
复合油藏抽汲井测试资料数值试井分析
2.
The Utilization of DST Data for Reservoir Analysis and Evaluation.
运用中途测试资料进行储层分析和评价
3.
Analysis Method of Steady Well Test in Abnormal High Pressure and Low Permeability Reservoirs
异常高压低渗复杂油藏稳定测试资料分析方法
4.
DST Data Interpretation and Evaluation for Well Honghe105 in Zhenjing Oilfield
镇泾油田红河105井DST测试资料解释与评价
5.
Optimizing Separated Layer Water-Flooding by Utilizing Injection Profile Test Data
利用吸水剖面测试资料优化分层注水措施
6.
Identification of "Big Channel" in Reservoir by Pressure Drawdown Test Data Analysis
利用压力降落测试资料识别油层“大孔道”
7.
Comprehensive Application of the Well Test Data Interpretation and Analysis Method of Petroleum Reservoir Performance
油藏动态系统试井测试资料的解释分析综合应用
8.
Determine Deliverability Equation of Oil/Gas Well by Well Test and Production Test Data in Haixinan Area
利用试采测试资料确定海西南地区油气井产能方程
9.
Research on the Interpretation Method of Delaminate Dynamic Parameters in Layered Water Injection Wells;
分层注水井测试资料的分层动态参数解释方法研究
10.
Assimilation Experiment of Sounding Data on the Rainfall in Southwest China
探空观测资料在西南暴雨中的同化试验
11.
File Data Quality Control of Experimental Check in Highway Construction Project
公路建设项目试验检测档案资料质量的控制
12.
Construction and Test on Automatic Compiling System for Agricultural Ancient Books
农史专题资料自动编纂系统的构建与测试
13.
The analysis about the data of curtain grouting, pressure water test and monitoring on seepage flow shows that the plan is conforming to the actual situation, and their construction quality is quite well.
介绍了设计内容,并对帷幕灌浆资料、水试验资料和渗流监测资料也进行了分析。
14.
This is how you are contributing to this program and these materials, by being willing to test run the introspection and healing offered.
这是你如何对本项目及这些资料作出贡献的过程,愿意来测试运作所提供的内省资料与疗愈。
15.
People have tested the system and edited the data.In brief,everything is ready.
大家测试了系统,编写了资料,总之一切都准备好了。
16.
Physiological tests help us to classify data but do not identify what is or is not human.
生理学测试有助于我们进行资料分类,但不能区别人与非人。
17.
ANALYSIS OF PUMP STATION SAFETY MONITORING DATA FOR FIRST TRIAL OPERATION OF YELLOW RIVER DIVERSION PROJECT
引黄工程首次试通水期间泵站安全监测资料的分析
18.
They tested it with climate information from Botswana from between nineteen eighty-two and two thousand two.
他们用1982年-2002年间博茨瓦纳地区的气象信息(资料)测试该系统。