说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 主拱
1.
The Arched Bridge Arches Constructs Participates in the Host Arch Ringjoint Action Research;
拱桥拱上建筑参与主拱圈联合作用研究
2.
Main arch construction control of the half-through steel pipe concrete arch bridge
中承式钢管混凝土拱桥主拱施工控制
3.
The Study on Technology of Using Reinforced Concrete Yoke to Strengthen Arch Bridge;
钢筋砼套箍封闭主拱圈加固拱桥技术研究
4.
Analysis on the Main Arch and End Beam of CFST Arch Bridge with Flexible Tied Bar;
“飞燕式”钢管混凝土拱桥主拱与端横梁受力分析
5.
Influence on Main Arch Ring of Bridge Abutment Horizontal Displacement and Arch Axis Deformation;
墩台水平位移和拱轴线变形对主拱圈的影响
6.
Preprocessing of Monitoring Deflection Data on the Main Arch Ring with High Differential Elevation
拱桥大高差主拱圈挠度监测数据预处理
7.
Study on Arch Structure Optimization of Long-span CFST Arch Bridge
大跨度多肢钢管混凝土拱桥主拱构造优化研究
8.
Introduction and Analysis of Construction Method for Main Arch Ring of Reinforced Concrete Box Arch
钢筋混凝土箱形拱主拱圈施工方法介绍及分析
9.
Adjustment of Buckle-cable Forces Under Cable-hoisting Construction of Concrete-filled Steel Tubular Arch Bridges
钢管混凝土拱桥主拱钢管缆索吊装扣索索力调整(英文)
10.
Structure Analysis of Arch Rib of Long Span Tied Concrete-Filled Steel Tubular Arch Bridge During Construction Procedure;
大跨度钢管混凝土系杆拱桥主拱肋施工过程结构分析
11.
Optimal Structural Design of "Stfc" Main Arch Rib During Construction Prior Period Based on Reliability;
钢管劲性骨架拱桥施工前期主拱肋结构优化设计
12.
Discussion on Optimal Parameters Combination of Arching System Based on Composite Main Arch Circle Method
基于复合主拱圈加固拱桥技术中锚固系统最佳参数组合探讨
13.
CONSTRUCTION TECHNOLOGY FOR MAIN ARCH OF SOUTH-NORTH GATE BRIDGE PROJECT IN YANGSHAN DEEP WATER PORT
洋山深水港南北闸桥工程主拱施工技术
14.
Deflection Calculation and Analysis in Construction Stage of Main Arch Ring of Zengjiagou Bridge
曾家沟大桥主拱圈施工阶段挠度计算和分析
15.
Several Considerations on the Internal Forces of Arch Bridge Calculating and Redistributing by Assumed Load Method
用假载法计算和调整主拱截面内力的若干思考
16.
Research and Treatment on Main Engineering Geologic Problems of Zhaolaihe River Arch Dam
招徕河拱坝主要工程地质问题及处理
17.
Discussion on the CFST Arch Main Bridge Construction of North Beicheng River Bridge
浅谈北澄子河大桥钢管砼拱主桥施工
18.
The pointed arch, mistress since that time, constructed the rest of the church.
尖拱从此后来居上,构成这座主教堂的其余部分。