说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 预制拼装
1.
Design of 60-m Span Precast and Assembled Main Girders of Shanghai Changjiang River Bridge
上海长江大桥60m跨预制拼装主梁设计
2.
Alignment Control for Short-line Precast Segmental Bridges
短线法节段预制拼装桥梁线形控制探讨
3.
The research on method of geometry-control during erection of the short-line bridge
基于几何控制法的短线预制拼装箱梁研究
4.
The supervision control of multi-used prefabricated concrete fixed crane base construction
混凝土预制拼装多用塔机基础施工的监理控制
5.
On Box Girder Precast Segment Assembling by Short-line Method & Alignment Control Technological Principle
短线法箱梁节段预制拼装及线形控制技术原理
6.
Application of Precasting and Assembling Techniques to Construction of Shanghai Changjiang River Bridge
预制拼装技术在上海长江大桥中的应用
7.
Discussion on Several Hot Spot Issues for Precast Concrete Consolidated Foundation of Tower Crane
混凝土预制拼装塔机基础几个热点问题探讨
8.
OPTIMIZATION OF THE SHAPE OF PREFABRICATED CONCRETE TOWER CRANE BASE
混凝土预制拼装多用塔机基础底面形状的优化
9.
Parallel wire strands supported the precast deck every 27ft
使用平行钢丝索来支承预制拼装的桥面结构,钢索间距为27英尺。
10.
Study on Construction Geometry Control of Prefabrication Based on Short-Line Method and Cantilever Erection Continuous Girder Bridge;
短线预制悬臂拼装连续梁桥施工线形控制研究
11.
Study on Construction Technology of Box Girder Segment s Stub Matching Precast and Cantilever Erection;
箱梁短线匹配预制及悬臂拼装施工技术研究
12.
Technology Research for Steel Box Girder Fabrication and Preassembly of E Dong Yangtze River Bridge
鄂东大桥钢箱梁梁段制造及预拼装技术研究
13.
Comprehensive Application of Construction Techniques for Segmental Precasting and Cantilever Assembling to Bridge Works
节段预制、悬臂拼装工艺在工程中的综合运用
14.
Study on the Mechanical Characteristics of Precast Segmental Concrete Box Girders with External Tendons;
预制节段拼装体外预应力混凝土箱梁受力特性研究
15.
Researching Manufacture of Newly Prefabricated Box Beam Segment Bridge Erector and Technology of Assembly Quality Control
新型预制箱梁节段架桥机的研制及拼装质量控制技术
16.
Research on Method of Geometry Control during Cantilever Erection of PC Cable-Stayed Bridges;
预应力混凝土斜拉桥悬臂拼装施工线型控制方法研究
17.
Research and Application of Cantilever Assembly Equipment to Prefabricated Segmental Box Girder of Shanghai Yangtze River Tunnel-Bridge Section B6
上海长江隧桥B6标预制节段箱梁悬臂拼装设备研究与应用
18.
Study on Construction Technology for Pre-fabricated Segmental Box Girder Cantilever Erection in Shanghai Yangtze River Tunnel-Bridge Section B6
上海长江隧桥B6标预制节段箱梁悬臂拼装施工技术研究