说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 坝基开挖
1.
Study on Excavation Disturbed Zone and Ogee Excavation Scheme of High-stress Dam Foundation at Deep Valley
高地应力峡谷高拱坝坝基开挖扰动效应与反弧开挖形式优化研究
2.
Quality Control of Foundation Excavating Construction of Arch Dam in Huanghuazai Hydropower Station
黄花寨水电站拱坝坝基开挖施工质量控制
3.
Finite element analysis of foundation unloading and relaxation effects of Xiaowan Arch Dam
小湾拱坝坝基开挖卸荷松弛效应的有限元分析
4.
Researches in the Influence of Foundation Excavation on Engineering Properties of Foundation Rock in High Arch Dam;
高拱坝坝基开挖对建基岩体工程特性影响的研究
5.
The Research on Security Monitoring Technology of Wu-du Reservoir Dam Foundation Blasting Excavation;
武都水库工程坝基开挖爆破安全监测技术研究
6.
Test Analysis on Blasting Vibration in Dam Foundation Excavation of Wanjiakouzi Hydropower Station
万家口子水电站坝基开挖爆破振动试验分析
7.
EXPERIMENTAL STUDY FOR UNLOADING AND RELAXATION OF DAM BASE DURING EXCAVATION AT XIAOWAN HYDROPOWER STATION
小湾水电站低高程坝基开挖卸荷松弛机理试验研究
8.
RESEARCH ON UNLOADING AND ZONATION OF ROCK MASS DAM FOUNDATION EXCAVATION-A CASE STUDY OF XIAOWAN HYDROPOWER STATION
坝基岩体开挖卸荷与分带研究——以小湾水电站坝基岩体开挖为例
9.
Application of acoustic wave test in excavation of dam foundation of Nuozadu Hydropower Station
声波测试在糯扎渡大坝基础开挖中的应用
10.
Rock Station Quality Assessment and Feedback Study on Excavation of Long Kaikou Hydropower Station
龙开口水电站坝基岩体质量评价及开挖施工信息反馈研究
11.
Study on Classification of Rock Mass Quality and Excavating Depth of Available Foundation of the Jinping Arterial Power Station;
锦屏一级水电站坝基岩体质量分类及建基面开挖深度研究
12.
The Effect of Underground Plant s Excavation on the Anti-sliding Stability of BaiShan Arch Dam;
白山大坝地下厂房开挖对建基面抗滑稳定性的影响分析
13.
Study on the Pliability Cushion Explosion Method and Effectively of the Protected Level of Dam Foundation Rock s Excavating;
大坝基岩保护层开挖中柔性垫层爆破方法及爆破效果研究
14.
Study on Construction Method of Firstly Curtain Grouting before Blasting Excavation on Dam Core Foundation;
大坝心墙基础先帷幕灌浆再爆破开挖施工方法的研究
15.
Optimization and organization on excavation and construction of the left abutment of Hongjiadu Hydropower Station
洪家渡水电站左坝肩开挖施工优化与组织
16.
Blasting Vibration Measurement for Dam Abutment of Lijiaxia Hydropower Station
李家峡水站工程坝肩开挖的爆破震动测量
17.
Numerical Simulation of the Impact on Hongshi Dam Due to Blasting Excavation of Stilling Pool;
消力池爆破开挖对红石大坝影响的数值模拟
18.
Studies on Excavation Test of Rock Blasting and Vibration Monitoring in the Danjiangkou Dam
丹江口大坝爆破开挖试验及震动监测成果分析