说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 送电工程
1.
The application of project management in the progress management of power transmission engineering;
项目管理法在送电工程进度管理中的应用
2.
Improvement and Implementation of Management Information System for Power Transmission and Distribution Projects;
送变电工程管理信息系统改进及实施
3.
Cost Control of Power Supply and Transformation Project under Construction;
送变电工程项目实施阶段的造价控制
4.
A Study on Environmental Impact Assessment on 500 kV Extra-high Tension Power Transmission Engineering
500kV超高压送变电工程环境影响评价
5.
Handheld GPS to the Construction of Transmission Line Project
手持式GPS在送电线路工程中的应用
6.
Application of GPS technology to open-wise transmission line
GPS技术在架空送电线路工程中的应用
7.
Research about the Assessment and Application of the Construction Safety Risk of Transmission and Distribution Project
送变电工程施工安全风险评价及应用研究
8.
The Hydrological Analysis Method of the Aerial Transmission Line in the Store Floodwater Areas
分蓄洪区架空送电线路工程水文分析方法
9.
“Transporting Western Power Eastward”Project and the Sustainable Development of the Economy of the Economic Belt of the Yangtse River Delta”;
“西电东送”工程与“长三角经济带”经济可持续发展
10.
The Research of the Diagnose on Human Resources Management of Gansu Power Transmission & Transformation Engineering Enterprise
甘肃送变电工程公司人力资源管理诊断研究
11.
Project Cost Control of the Entire Process for Transmission and Distribution Enterprises
送变电项目施工成本的全过程控制研究
12.
Research on the Cost Control of Long-ping 500KV Transmission Line Project
龙平500KV送电线路工程成本控制问题研究
13.
Work was accelerated to ensure that every county seat is served by asphalt roads, that every township has access to electricity, and that every village enjoys radio and television reception.
“油路到县”、“送电到乡”、“广播电视到村”等工程加快实施。
14.
Power System Stability Simulation Study in the Power Transmission from the West to the East;
西电东送工程中电网稳定性若干问题的仿真研究
15.
Reseach on Electromagnetic Environment of UHVDC Transmission Works in Jinping and Guandi Hydro Power Station
锦屏、及官地水电站特高压直流送出工程电磁环境研究
16.
Engineers will thus need to augment the transmission system with new technologies to transport hundreds more gigawatts from remote generators to major cities.
因此,工程师必须以新科技辅助输送系统,由外地发电机多输送数亿瓦特的电力给大城市。
17.
Five-year development and new achievement of hydropower construction:Review of investigation and design for West to East Power Transmission Project;
五年大开发 水电谱新篇——贵州西电东送工程首批水电项目勘测设计工作回顾
18.
An error occurred while routing the binder. Make sure your e-mail program is working correctly.
传送活页夹时出错。请确认您的电子邮件程序工作正常。