说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 施工场地
1.
"three connections and one leveling" assuring that a construction site is connected to water and electric power supplies and roads, and that the ground is leveled before a project is begun.
三通一平(水通、电通、路通、施工场地平)
2.
Application of Intelligent Energy Saving Equipment in Large Scale Construction Yard Lighting
智能节电器在大型施工场地照明中的应用
3.
A Visual Dynamic Demo System for Construction Site Layout in Hydraulic Projects
水利水电工程施工场地总布置可视化动态演示系统研究
4.
Construction: workers start the construction according to scheme of decoration.
进场施工:工程人员根据设计施工方案进工地施工。
5.
The place for effective action is the job site.
采取有效措施的地点就是工作场所。
6.
Research on the Construction Technique of Spanning Bridge in Limited Space;
场地受限时跨线桥梁的施工技术研究
7.
Research on Sprinkler Design and Construction Process of Square Lawn
广场草坪地喷灌设计和施工过程研究
8.
Construction Technique of an Underpass Project of Shenyang Fangxing Square
沈阳市方形广场地下通道工程施工技术
9.
DESIGN AND CONSTRUCTION OF FULLY-BURIED UNDERGROUND PROJECT OF ZHUHAI PORT PLAZA
珠海口岸广场全埋式地下工程设计与施工
10.
Lightning Protection and Grounding Engineering Construction for the T3A Main Building of Capital International Airport
首都国际机场T3A主楼防雷、接地工程施工
11.
Study on the Construction Technology of Shield Launching Shaft of Urban Metro in Narrow Field
城市地铁狭小场地盾构始发井施工技术研究
12.
The Impact of Prestressed Pile′s Construction on the Earthquake Liquefaction
预应力管桩施工对场地地震液化的影响
13.
For improve site soil condition and ensure piling work safety, we have worked out dewater construction proposal.
为改善现场施工的场地条件,保证压桩工程的安全进行,编制降水工程的施工方案.
14.
Investigation on Construction Technology and Security of Underpassing Metro Station Crossing Railway Ground;
地铁车站下穿铁路站场施工技术与安全性研究
15.
The Mechanical Analysis on Construction of Tianfu Plaza Deep Foundation Pit in Chengdu Metro;
成都地铁天府广场深基坑施工力学分析
16.
Study on Deep Foundation Pit Construction Monitoring in Metro Station of Haizhu Square;
海珠广场地铁车站深基坑施工监测研究
17.
Strengthening the Worksite Construction Management of theCement Spurring Stake in Complex ground;
浅谈水泥粉喷桩复合地基施工现场管理
18.
On Design of Foundation Pit Top-down Method Construction of Chengdu Street Underground Car Parking Project in Taipa,Macao
澳门凼仔成都街地下停车场基坑逆筑施工设计