说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 高拱坝施工
1.
Study on Working Condition during Construction Period and Integral Degree of Safety on JinPing Arch Dam
锦屏高拱坝施工期性态分析及整体安全度研究
2.
Theory and Application of High Arch Dam Construction Simulation Modeling under Virtual Scene
虚拟场景下高拱坝施工仿真建模理论与应用
3.
Study on Effects of Construction Proccess and Crack Inducor at the Upstream Base of High Arch Dam;
施工过程及底缝对高拱坝的影响研究
4.
Formwork construction technique for controlling the shape of high double-curvature arch dam
控制双曲高拱坝体型的模板施工技术
5.
Study on Construction Process Simulation and Optimization for High Roller Compact Concrete Arch Dam;
高碾压混凝土拱坝施工过程仿真与优化研究
6.
Quality Control of Foundation Excavating Construction of Arch Dam in Huanghuazai Hydropower Station
黄花寨水电站拱坝坝基开挖施工质量控制
7.
Study on Proccessing Construction Lofting Graphics in Arch Dam CADC
拱坝CADC中施工放样图形处理研究
8.
Joints Grouting Construction Technology of Arch Dam in Goupitan Hydropower Station
构皮滩水电站拱坝接缝灌浆施工技术
9.
Dynamic tracking simulation analysis of temperature field of Xiaowan Arch Dam during construction period
小湾拱坝施工期温度场动态跟踪仿真
10.
Analysis on Forced Behavior of High Arch Dam s Outlet Bearing Structure;
高拱坝泄洪孔支承结构工作性态分析
11.
Study on Engineering Work Budget Method in Computer Simulation of Arch Dam Construction
计算机模拟拱坝施工中工程量预算方法研究
12.
Simulation Analysis Method Study on RCC Arch Dam;
碾压混凝土拱坝施工仿真分析方法研究
13.
Simulation on Arch Dam Construction and Pouring Process Design;
混凝土拱坝浇筑施工仿真研究与仓面设计
14.
Construction and Temperature Controlling Simulation Analysis for Wanjiakouzi RCC Arch Dam;
万家口子碾压混凝土拱坝温控施工仿真分析
15.
Operation and Management of Cable Cranes in the Construction of Xiaowan Arch Dam
小湾水电站拱坝施工中缆机的运行管理与探索
16.
Influence of the Cold Wave on the Temperature Stress During the Construction Period on Roller Compacted Concrete Arch Dam
寒潮对碾压混凝土拱坝施工期温度应力的影响
17.
Application of the Program by the CASIO-4800 Calculator into the Construction Measuring for the Double Curve Arch Dam
CASIO-4800计算器编程在双曲拱坝施工测量中的应用
18.
Application of slope-layer construction method to the arch dam with rouer compacted concrete of Bailianya Reservoir
斜层施工法在白莲崖水库碾压砼拱坝中的应用