说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 钢管脚手架
1.
Steel tube scaffold couplers
GB15831-1995钢管脚手架扣件
2.
Design and Research of High-altitude Steel Platform Steel Tube Scaffolding Support Structure;
高空钢平台钢管脚手架支撑结构的设计与研究
3.
Support System Design of Steel Platform for the Steel Pipe Scaffold High above the Ground
高空钢平台钢管脚手架支撑结构的设计
4.
Technical code for safety of frame scaffoldings with steel tubules in construction
建筑施工门式钢管脚手架安全技术规范
5.
AN ANALYSIS OF THE EXPERIMENT IN JOINT-TYPES OF BUCKLE-TYPE STEEL TUBULAR SCAFFOLDING
扣件式钢管脚手架杆件接头型式试验分析初探
6.
Reinforcement on steel tubular scaffold with couplers of the super-think roof and high wall
超厚顶板和高大墙体的扣件式钢管脚手架加固
7.
ANALYSIS OF STABILITY OF DOUBLE-POLE STEEL-PIPE SCAFFOLD WITH BOWL-BUCKLE
双排碗扣式钢管脚手架稳定承载力分析
8.
ANSYS-BASED ANALYSIS ON WHOLE STABLE LOAD-BEARING CAPACITY OF STEEL TUBULAR SCAFFOLD WITH COUPLERS
用ANSYS分析扣件式钢管脚手架整体稳定承载力
9.
Bracing design and construction of form of steel pipe scaffold with overhanging fastener
悬挑扣件式钢管脚手架模板支撑的设计与施工
10.
Construction technology measures of large area buckle type steel pipe scaffolding
高层大面积扣件式钢管脚手架施工技术措施
11.
A semi-rigid node calculation method for steel tubular scaffold with complete based on back-analysis of scaffold load-bearing experiments results
基于整架试验的扣件式钢管脚手架半刚性节点计算方法
12.
Structure Study and Standard Design of High-rise Fastener Steel Tube Scaffolding;
高层建筑扣件式钢管脚手架构造研究与标准化设计
13.
Experimental Study on Semi-Rigid Joint and Basic Load-Bearing Element in Plug-pin Steel-tube Scaffold;
插销式钢管脚手架半刚性节点及基本受力单元体试验研究
14.
Study on the Computation Method and Software Development of Clip-holding Steel-tube Scaffold;
扣件式钢管脚手架结构计算方法研究与程序开发
15.
The Research and the Finite Element Analysis of Large Area and High-level Steel Tube Scaffolding Support Structure;
大面积高层钢管脚手架支撑结构的研究与有限元分析
16.
The Study on the Stability Bearing Capacity of Vertical-insert and Self-locking Multifunctional Tubular Steel Scaffolding;
直插式双自锁型多功能钢管脚手架稳定承载能力研究
17.
Several Questions of the Multi-erecting Poles Buckle Type Steel Pipe Scaffold;
多立杆扣件式钢管脚手架在设计计算中应注意的几个问题
18.
Standing formwork used in steel falsework applied in practice;
钢管脚手架支立模板在田庄洗煤厂精煤仓改造中的应用