说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 长江大堤
1.
Application of Cross-Borehole Electromagnetic Computerized Tomography in Karst Detection along Yangtze River Levee
井间电磁波CT技术在长江大堤岩溶探测中的应用
2.
Brief Talking on Shield Construction Machine through Anqing Changjiang River Dam by "D" Mode Impel Technique
浅谈盾构机采用“D”模式推进工艺穿越安庆长江大堤
3.
Analysis of monitoring results for seepage in foundation of?Anqing section of Changjiang dike
安庆长江江堤堤基及堤后渗流监测成果分析
4.
Long distance reclamation for strengthening of Jingjiang Dyke
荆江大堤加固工程中的长排距吹填施工
5.
EFFECT ANALYSIS OF PREVENTING SEEPAGE ENGINEERING IN SHIJIAO SEGMENT OF NORTH RIVER LEVEE
北江大堤石角堤段防渗工程效果分析
6.
First-class dikes on the Yangtze, Yellow and other major rivers should be built or reinforced to enable them to withstand the largest flood to happen ever since the founding of New China.
要建设好长江、黄河等大江大河的一类堤防工程,能防御建国以来发生的最大洪水。
7.
Study on Permeating Failure Model and Mechanism in Shijiao Segment of Beijiang River Levee;
北江大堤石角段堤基渗透破坏模式及机制研究
8.
Bid invitation practice for concealed works of important dyke along the Yangtze river
长江重要堤防隐蔽工程招标工作实践
9.
A dam built across a great river is impressive.
横跨大江的堤坝才是了不起的。
10.
Pipe Jacking Construction Technology of Traversing Qiantang River Embankment
穿越钱塘江大堤的顶管工程施工技术
11.
The bagged sand core sloping dike structure and its design method in the Yangtze Estuary Deepwater Channel Regulation Project
介绍长江口航道治理工程中袋装砂堤心斜坡堤结构及设计方法。
12.
Bagged Sand Core Sloping Dike Structure and Its Design Method in Yangtze Estuary Deepwater Channel Regulation Project
长江口深水航道治理工程中袋装砂堤心斜坡堤结构设计
13.
Deepened Reform of Levee Construction System --Study on Levee Construction along the Yangtze River;
堤防工程建设体制的深刻变革——对长江堤防工程建设的认识和思考
14.
How Built -in Works Construction on the Main Levees Affect Internal Demand and Economy Ex- pansion;
长江重要堤防隐蔽工程建设投资对扩大内需、拉动经济的作用和影响
15.
Inspection report of the experience of construction and management on Shaoxing Urban Flood Control Project,Huanghe Grand Dyke and Jingjiang Grand Dyke
绍兴城防、黄河大堤、荆江大堤建管经验的考察报告
16.
Design of the Sloping-Faced North Leading Dike With Bagged-Sand Core for the Yangtze Estuary Deepwater Channel Regulation PhaseⅠProject
长江口深水航道治理工程一期工程北导堤袋装砂堤心斜坡堤的设计
17.
The design and construction of the sloping- faced north leading dike with bagged- sand core for the 1st phase of the Yangtze Estuary deepwater channel regulation project are introduced.
介绍长江口深水航道治理一期工程北导堤袋装砂堤心斜坡堤的设计与施工。
18.
Safety Analyses and Evaluate of Reinforced Segments Beijiang Levee;
北江大堤部分堤段加固达标后的安全性分析评价