说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 地下洞室群施工
1.
Study on the Construction Characteristic of Underground Carvens Group for Goupitan Hydropower Station;
构皮滩电站地下洞室群施工特性研究
2.
Research on System Simulation Theory and Application for Construction Processes of Large-Scale Underground Structure Group;
大型地下洞室群施工系统仿真理论与应用研究
3.
Monitoring at Construction Period and Dynamic Reinforcement of Underground Power House Group;
地下洞室群施工期监测与动态支护设计研究
4.
Real-Time Control for Construction Scheduling of Large Scale Underground Structure Group;
大型地下洞室群施工进度实时控制研究
5.
Study on Dynamic Visual Simulation and Optimization for Ludila Underground Structure Group Construction;
鲁地拉地下洞室群施工动态可视化仿真与优化研究
6.
Construction Optimization of Large Underground Chamber Group and Research of Surrounding Rock Stability;
大型地下洞室群施工方案优化及围岩稳定性研究
7.
Study on Construction Simulation and Optimization for the Underground Cavern Group of Huizhou Pumped Storage Station;
惠州抽水蓄能电站地下洞室群施工仿真与优化研究
8.
Study on Construction Simulation and Network Schedule for Yabiluo Underground Structure Group Construction
亚碧罗地下洞室群施工仿真与网络进度分析研究
9.
Numerical Simulation Analysis of the Excavation Process of Dagangshan Underground Carven Group
大岗山水电站地下洞室群施工过程数值模拟分析
10.
Construction control for engineering geologic body of underground power house chambers
地下厂房洞室群工程地质体施工控制
11.
Research on Ventilation for Large Scale Underground Cavity Groups Construction;
大型地下工程洞室群施工期通风研究
12.
Construction Numerical Simulation of Cavern Group in Underground Hydropower House;
水电站地下厂房洞室群施工数值仿真
13.
Nuozhadu Underground Powerhouse Cavern Group Study of Rational Sequence Constructiong;
糯扎渡水电站地下厂房洞室群施工顺序研究
14.
Feedback Analysis Based on Monitoring of the Caverns Excavation of Underground Hydropower Plants
水电站地下厂房洞室群施工监测反馈分析
15.
Three Dimensional Numerical Simulation Analysis on Underground Powerhouse Complex Construction
地下厂房洞室群施工过程的三维数值模拟分析
16.
The Option of Excavation Sequence of Large-sized Underground Cavern and the Research of Construction Technique of Underground Factory;
大型地下洞室群开挖顺序选择及地下厂房施工技术研究
17.
Surrounding rock mass stability analysis by using 3DEC and informational construction of Xiangjiaba underground cavern group
向家坝地下洞室群围岩稳定3DEC分析与信息化施工
18.
Study on Work Behavior of Large Scale Underground Caverns of Hydroelectric Project;
大型水电工程地下洞室群工作性态研究