说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 坝身泄洪
1.
Optimization for Layout of Flood-release Structures and Energy-dissipators for High Arch Dams;
高拱坝坝身泄洪与消能建筑物的优化布置
2.
The study of the thin-arch-dam layout for flood spillway and the effect of energy dissipation
薄拱坝坝身泄洪布置及消能效果的研究
3.
Hydroelastic Model Test Research on Releasing Flood Vibration of Arch Dam for Goupitan Project
构皮滩拱坝坝身泄洪振动水弹性模型试验研究
4.
Study on the Static Characteristics of the High Arch Dam Body and the Vibration Induced by Discharge Flow;
高拱坝坝身静力特性及泄洪振动研究
5.
Analysis on Forced Behavior of High Arch Dam s Outlet Bearing Structure;
高拱坝泄洪孔支承结构工作性态分析
6.
Study on Changheba Hydropower Station Flood Discharging Works Layout
长河坝水电站泄洪建筑物的布置研究
7.
A Study on Stress Influence of the Large Orifice on the Masonry Arch Dam;
大尺寸泄洪孔对浆砌石拱坝坝体应力影响研究
8.
The Stability Analysis of the Letting Out Trough Biteplate of Top Spillway of Local Material Dam;
当地材料坝坝顶溢洪道泄槽底板的稳定分析
9.
Characteristics Research of the Spillway Discharge on Overflow Concrete Face Rockfill Dam;
溢流式面板堆石坝坝体溢洪道泄流特性研究
10.
Study on Indexes System of Risk Analyis of Discharge Structures and Flood Discharge Calculation Based on Concrete Dam;
基于混凝土大坝的泄洪建筑物风险指标体系及泄洪风险研究
11.
On Some Hydraulie Problems in Water Tunnelsof High Tailings Dams
高尾矿坝泄洪洞若干水力学问题的探讨
12.
Numerical Simulation and Experiment Study on Flood Discharge and Energy Dissipation of High Dam with Large Discharge
高坝大流量泄洪消能数值模拟及实验研究
13.
Experiment Research and Numerical Simulation on Flow Field of Discharge from Surface-Bottom Outlet on Low Waterhead and Big Flux;
低水头大流量厂坝联合泄洪消能流场的研究
14.
Safety Analysis and Simulation of Flood Discharge of High Arch Dam and Counter-arch Plunge Pool;
高拱坝及反拱水垫塘结构泄洪安全分析与模拟
15.
Three-Dimensional Numerical Simulation on Flood Field of Riverbed Hydropower Station
河床式电站大坝泄洪流场的三维数值模拟
16.
Concrete construction management in reconstruction of energy dissipation structures of Hongshi dam
红石大坝泄洪消能工改造工程混凝土施工管理
17.
Safety management in reconstruction of energy dissipation structures of Hongshi dam
红石大坝泄洪消能工改造工程安全管理
18.
Control of explosion in reconstruction of energy dissipation structures of Hongshi dam
红石大坝泄洪消能工改造工程爆破施工控制