说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 架线施工
1.
Technical specification for construction of cross power transmission line in installing the conductor
跨越电力线路架线施工规程
2.
Stringing Construction of GTACSR288 Gapped Heat Resistant Up-Rating Conductor
GTACSR288间隙型耐热倍容量导线的架线施工
3.
Constructing Method of Crossing over 110kV Baoyin and Tianwu Transmission Line without Power Interruption
不停电跨越110kV保阴线、天五线架线施工方法
4.
One-drag-eight Line Stringing Construction Procedures for 1000 kV UHV Transmission Line
1000kV特高压输电线路一牵八架线施工工艺
5.
Main techniques of the string of gap-type thermal-resistant aluminum-alloy stranded conductor
间隙型钢芯耐热铝合金导线架线施工技术要点
6.
Improvement on Tower Erection and Line Stringing Technology in Beijiang Large Crossing Span Project
北江大跨越工程立塔及架线施工技术的改进
7.
Study on Installation and Construction Technique for Large Cross Area Conductor in UHV Transmission Lines
特高压输电线路大截面导线架线施工工艺的研究
8.
Integral Curvilinear Sliding Construction Technology for Large Span Steel Truss Structure and Falsework;
大跨度钢桁架胎架整体曲线滑移施工技术
9.
Construction Method of Replacing the Upper Section of Concrete Poles after Stringing
架线后更换混凝土杆上段的施工方法
10.
Construction Technology for 32m Whole-span Box Girder Erection in Passenger Dedicated Line
客运专线32m整孔箱梁架设施工技术
11.
The Installation Techniques for 900t Box Beams for Passenger Railway
客运专线900t整孔箱梁架设施工技术
12.
On the construction technology of the erection of the double line box girder along the Beijing-Shanghai railway express
京沪高铁双线整孔箱梁架设施工技术
13.
Application of Helicopter in Overhead Transmission Line Construction
直升机在架空输电线路施工中的应用
14.
Construction Techniques for Double-track Full-span Box Girder Erection in Shitai PDL
石太客运专线双线整孔箱梁架设施工技术
15.
The paper studies the integral curvilinear sliding construction for truss structure by using shape steel tube falsework for first time, which developes the technology of sliding construction.
首次在实际工程中采用型钢管胎架进行桁架胎架整体曲线滑移施工,拓展了滑移施工工艺。
16.
Method of Comprehensive Evaluation of Construction Quality For UHV Overhead Line Project
超高压架空线路工程施工质量的综合评判方法
17.
A Summarized Account of Bridge Erection Construction of South Section of Hau Hoi Wan Trunk Road Project,Hong Kong
香港后海湾干线南段工程架桥施工综述
18.
Construction Technology of Cast-in-place Roof Beams of Frame with Large Span and the BehindTension Curve Pre-stressed Force;
大跨度后张曲线预应力现浇框架梁的施工工艺