说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 泄洪冲沙
1.
INFLUENCE OF FLOOD DISCHARGE AND SAND SCOURING OF THREE GORGES RESERVOIR AND GEZHOUBA RESERVOIR ON DEFORMATION OBSERVATION AT YICHANG SEISMOSTATION
三峡与葛洲坝水库泄洪冲沙对宜昌台形变观测的干扰
2.
Study on Model Test for Estimating Scouring in Bedrock during Ski-jump Energy Dissipation at End of 1# Spillway Tunnel of Zipingpu Project
紫坪铺1号泄洪排沙隧洞挑流基岩冲刷模型试验研究
3.
Shape optimization test of Dabeigou spillway reservior desilting tunnel
大北沟水库泄洪排沙洞体型优化试验
4.
The deposition of sediment in channels decreases the channel capacity and the flood-carrying capacity.
泥沙淤积在河道内,减少了河槽容量和泄洪能力。
5.
Study on model test for a large scale prestressed pier of a flood releasing and scouring sluice
大型泄洪排沙闸预应力闸墩结构模型试验研究
6.
Toutun River Reservoir Upstream Flushing Funnel and the Emptying of the Initial Flushing
头屯河水库坝前冲沙漏斗及泄空冲沙的初步探讨
7.
Desilting Sluice Underport Working Chamber Analysising of a Project by 3-Dfinite Element Method;
某工程泄洪排沙底孔工作闸室三维有限元计算分析
8.
Foundation Treatment of Vibro-Replacement Stone Piles of Spillway Gates in Xixiayuan Water Conservancy Project;
西霞院水利枢纽工程泄洪闸振冲碎石桩基础处理
9.
The article introduces the computer monitor system and picture monitoring system used in release sluice of Shaheji reservoir.
文章介绍滁州市沙河集水库泄洪闸采用的计算机监控和图像监视系统。
10.
Numerical analysis of the impact of the Nos. 2 & 3 berths′ engineering of Xinshanan operating zone on flood discharge and tide water storing of the Pearl River Estuary and river regime stability
新沙南作业区~#2,~#3泊位工程对珠江河口泄洪纳潮及河势稳定影响的数值分析
11.
Research Flood Releasing Safety of Flood Discharge Structure with High-head & Large-discharge
高水头大流量泄洪建筑物的泄洪安全研究
12.
When the flood waters weakened the bridge, it was shored up with steel beams and sang bags until it could be rebuilt.
洪水冲坏了桥梁,人们用钢梁,沙包加固,暂时维持以待重建。
13.
FEATURES AND REGULATION OF HIGH-SEDIMENT FLOODS IN THE LOWER YELLOW RIVER
黄河下游高含沙洪水冲淤特性及其调控对策初探
14.
Numerical simulation of the process of hyperconcentrated flood routing and channel deformation in the Lower Yellow River
黄河下游高含沙洪水演进及河床冲淤过程的数值模拟
15.
The floodwaters caved in the retaining wall
洪水冲垮了防洪堤。
16.
Discussion on discharge capacity calculations of drainage system of tailing ponds
某尾矿库排洪系统泄洪能力计算探讨
17.
The released flow from reservoirs carries less sediment load of bed material than pre? dam periods.
建坝后水库下泄水流挟带的床沙质含沙量减少,坝下游河床出现冲刷。
18.
Study on Indexes System of Risk Analyis of Discharge Structures and Flood Discharge Calculation Based on Concrete Dam;
基于混凝土大坝的泄洪建筑物风险指标体系及泄洪风险研究