说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 新坝船闸
1.
In combination with the construction practice of Xinba Lock, this paper introduces culvert construction of tile Lock's upper lock head and preventive measures for cracks.
通过新坝船闸施工实践,介绍了船闸上闸首输水廊道施工及预防裂缝产生所采取的措施。
2.
Safety Monitoring Renovation and Deformation Law Analysis for Gezhouba Third Ship Lock
葛洲坝3号船闸安全监测更新改造及变形规律初步分析
3.
Gezhouba dam is one of the largest sluice gates on a inside river in the world.
葛洲坝是世界上最大的内河船闸之一。
4.
Analysis of pivot bolt breaking for water gate of Xinqiao ship lock
新桥船闸闸门支铰连接螺栓断裂分析
5.
Other factors that may affect dam selection are roadways, fishway, locks, and log passages.
其他影响选坝的因素有道路,鱼道,船闸和筏道等。
6.
Fracture Dynamics Analysis for an Event of Failure in the Gudgeon Link for the Miter Gate of a Dam
某水坝船闸人字门拉杆破坏的断裂动力学分析
7.
Study on the Types of Lock Filling and Emptying Systems Adapted to High Dam Navigation
适用于高坝通航的船闸输水系统型式探讨
8.
Finite Element Analysis of Stoplog of Navigation Lock No.2 for Gezhouba Hydraulic Project
葛洲坝水利枢纽二号船闸叠梁门有限元分析
9.
Ground Treatment of Rubber Dam Ledgerwall of South-Fei River Sluice and Rubber Dam Project;
合肥市南河船闸、橡胶坝工程橡胶坝底板地基处理
10.
The navigation facilities at the Shulkou project comprise a one-way three-flight ship lock and a oneway 2×500-ton ship lift.
水口水电站航运过坝采用一线三级船闸和一线2×500t垂直升船机。
11.
Study on Navigation Condition of Down-stream Channel of Dajiang Lock of Gezhouba Project
葛州坝大江船闸下游航道通航水流条件试验研究
12.
Finite Element Analysis on the Emergency Gate of No.2 Navigation Lock of Gezhouba Water Conservancy Project
葛洲坝水利枢纽二号船闸事故检修门有限元分析
13.
Application of industrial ethernet in newport lock bridge
工业以太网技术在新港船闸桥的应用
14.
The lock keeper closed the lock gate.
船闸管理员关上了闸门。
15.
The anchorage of the high side-slope of Three Gorges Ship Lock and the development of new non-bonded anchorage cable
三峡船闸高边坡锚固及新型无粘结锚索开发
16.
Analysis on Numerical Simulation and Investigation of Reinforcement Method of New-old-structure Interfaces in Gate Engineering;
渠首加闸工程新旧坝体结合面数值仿真分析与加固措施研究
17.
weir with lifting gates
具有提升式闸门的坝
18.
Study on the Energy Dissipation Design and Operation of Multi-strobe in Low Water Head Dams;
多闸孔低坝消能设计与闸门调度研究