说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 签证管理
1.
Administrative Measures for Endorsement on Via of Ships Entering or Leaving Port
船舶进出港签证管理办法
2.
Strenthen the visa management of struction phase,control the cost of project;
加强施工阶段签证管理 控制工程造价
3.
Methods of Visa Management of the Owner and the Contractor;
业主、承包商加强工程签证管理的措施
4.
Promote Electronic Government Affairs Construction and Intensify Port Visa Administration;
推进电子政务建设 强化口岸签证管理
5.
On enhancing design alteration and site visa management work
论加强设计变更和现场签证管理工作
6.
Strengthening visa management and doing better engineering cost control
加强签证管理 做好工程造价控制
7.
Strengthening the Certification Management of Construction and Control the Engineering Cost
强化施工签证管理 控制工程造价
8.
The Problem and Countermeasures of Visa Managment of Supervision Unit in Construction Phase
施工阶段监理单位签证管理中的问题及对策
9.
Discussion of HVAC design alteration and management of project licenses;
浅析某暖通空调工程设计变更与工程签证管理
10.
Visa management of building engineering under engineering bill pricing mode;
清单计价模式下的建设工程计价签证管理
11.
Countermeasures of Project Visa Management Based on List Valuation Model
基于清单计价模式的工程签证管理对策研究
12.
to Strengthen the Management of Design Alteration and Project Licence and Control the Cost of the Project;
加强设计变更及工程签证管理严格控制工程造价
13.
On the Theory and Practice of the Management of Foreign Students Visas and Residence Permits;
浅析留学生签证和居留证管理的理论与实践
14.
On Construction Managers Certification Management in the Construction Course;
施工过程中监理对工程签证的管理研究
15.
The Trade Department administers this system and issues certificates of origin.
贸易署负责管理这个制度,并签发产地来源证。
16.
How to strengthen the management of the design change and the engineering visa;
谈如何加强设计变更和工程签证的管理工作
17.
Probe into the Project Site Visa & Design Variation Management for Power Project;
对电力工程现场签证和设计变更管理的探讨
18.
Measures to strengthen the management of design alternation and project license;
如何加强设计变更和工程签证的管理工作