说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 棉花滩水电站
1.
Study on Optimum Load Distribution between Units of Mianhuatan Hydropower Station
棉花滩水电站机组间负荷最优分配研究
2.
Safety Monitoring Index of Horizontal Displacement of Mianhuatan Dam
棉花滩大坝水平位移安全监控指标的拟定
3.
Ertan hydropower station is the first power station built on Yalong River.
二滩水电站是雅砻江梯级开发的第一个水电站。
4.
Estimation of Adit Dirt Volume in Longtan Hydropower Station Dam Area
龙滩水电站坝址区平洞结垢量的估算
5.
SEISMIC HAZARD ANALYSIS OF THE ERTAN DAM SITE
二滩水电站坝区场地地震危险性分析
6.
Appraisal on Supervision Work of Arch Dam Works of Ertan Hydropower Project;
二滩水电站拱坝工程监理工作后评估
7.
Financing for the Longtan Hydropower Project and its funds management;
龙滩水电站工程融资和资金使用管理
8.
Design on Dam Crest Gantry Crane and Access Bridge of Gelantan Hydropower Station
戈兰滩水电站坝顶门机及交通桥设计
9.
Optimization of Protection Configuration for 10kV Station Transformers of Longtan Hydropower Station
龙滩水电站10kV厂用变保护的优化配置
10.
Technical Innovation for Mechanical Hydraulic Drive System of Letan Governor
乐滩水电站调速器机械液压系统改造
11.
Joints Grouting Construction Technology of Arch Dam in Goupitan Hydropower Station
构皮滩水电站拱坝接缝灌浆施工技术
12.
Overview on Bulb Tubular Turbine Generator Design for Jinjitan Hydropower Station
金鸡滩水电站灯泡贯流式水轮发电机设计综述
13.
Summarization on the design of 6.3/0.4kV drainage transformer substation on plunge-pool at Ertan Hydropower Station
二滩水电站水垫塘6.3/0.4kV排水工程设计综述
14.
Chemical Grouting Treatment to Leakage in Transverse Joints inside Dam Body of Lingjintan Hydropower Station
凌津滩水电站坝体横缝漏水化学灌浆处理
15.
The Water Turbine Stability Problem Study for Wujiang Goupitan Hydropower Station;
乌江构皮滩水电站水轮机稳定性问题研究
16.
Discussion on Favoring the People of Relocation by Aquatic Breeding in Luodian Reservoir of Longtan Hydropower Station;
龙滩水电站罗甸库区水产养殖反哺移民的探讨
17.
Experimental research on overflow cofferdam of Tankeng Hydropower Station in Zhejiang Province
浙江滩坑水电站过水围堰模型试验研究
18.
Waterway Flushing Test on Overall Hydraulic Model for Letan Hydropower Station
乐滩水电站整体水工模型航道冲沙试验研究