说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 箱梁0#块
1.
The Technical Characteristic in the Construction Scheme of New-beach-bridge Box Girder 0#;
新滩大桥箱梁0#块施工支架方案的技术特点
2.
Construction of Y-shaped Pier and Start Element in Fujian Nanping Xicheng Bridge
福建南平西城大桥Y形墩及箱梁0号块施工
3.
Analysis and Treatment Measures of Crack Under the Anchorage on No.0 Web of a Continuous Rigid Frame Box Girder Bridge
某连续刚构箱梁桥0号块腹板锚下开裂原因分析及处理措施
4.
The Construction Craft at 0 #~1 # Node Section of Box Continuous Beam
箱形连续梁0~1~#节段施工工艺
5.
Construction Technique of Continuously Changing Hight Prestressed Concrete Beam 0 #;
变截面预应力砼连续梁0#块的施工
6.
Construction Techniques for Segment No.0 of the Continuous Girder of the Wujiawan Mega Bridge
吴家湾特大桥连续梁0~#块施工技术
7.
Application of Bracket with Double-cantilevers Longitudinal Beam in 0# Block of Cantilever Perfusion Beam
牛腿双悬臂纵梁用于悬灌梁0#块支架的研究
8.
The Application of Modular Stand to Huolangyu Box Beam Bridge
模块化支架在火郎峪箱梁桥中的应用
9.
Space Stress Analysis on Zero Block of Cantilever Construction Continuous Girder Bridge
悬臂施工连续梁桥0号块的空间应力分析
10.
Strut-and-tie model reinforcement of the external prestressed box-beam anchor block
体外预应力箱梁锚固块拉压杆模型法配筋
11.
The construction innovation of large span concrete box girder making use of MSS62.5 mobile template shelf and partitioning casting
MSS62.5移动模架分块浇筑大跨径箱梁桥的施工创新
12.
A Calculation Method for Throat Section of Turbocharger Turbine Volute
一种增压器涡轮箱0-0截面计算方法
13.
double box girder gantry crane
箱形双梁龙门起重机
14.
The beam is divided in4 parts, two each sitting on each main girder.
箱梁分为4个部分,每根主梁上2个。
15.
The Finite Element Method of Bridge Continuous Box Girder Beam and T Tepth Beam;
箱梁、T型断面梁的空间板有限元解法
16.
Study of indexes of continuous girders (double track line) erected with cast-in-place cantilever method;
悬浇连续箱梁(双线)梁部指标的研究
17.
Lifting and Installation of Steel Box Girder at Pylon and Girder Section of Edong Changjiang River Bridge
鄂东长江大桥塔梁段钢箱梁吊装施工
18.
Beixiang beam line factory 32 m whole bore box beam preparing technique
北乡制梁场32m双线整孔箱梁预制技术